Search
Skip to Search Results-
1977
A network of 56 permanent plots, radiating from the periphery of the Syncrude Lease, was established during the summer of 1976. This network will allow continuous quantitative monitoring of the lichen flora using photographic techniques. Since lichens are highly sensitive to air pollutants such...
-
1977
Grant, W., Tsui, P., Green, R., McCart, P.
This is a report of baseline studies of aquatic environments in the Athabasca River. These studies were carried out at the request of Syncrude Canada Limited and were focused in the vicinity of Syncrude's Lease Number 17, which borders the west bank of the Athabasca River north of the town of...
-
1977
The conservation equations governing buoyant plume rise are solved for the case of non-uniform wind conditions. A simple power law is selected to represent the actual wind profile. Analytical solutions are presented both for uniformly stable and neutral atmospheric conditions. These solutions...
-
Calculations of annual averaged sulphur dioxide concentrations at ground level in the AOSERP study area
Download1977
The Climatological Dispersion Model and the input data required for calculation of annual averaged values of sulphur dioxide concentrations at ground level are described. The most important meteorological input to the model is the long-term joint frequency distribution of winds in the vicinity of...
-
1977
Promet Environmental Group Ltd. was retained to perform an analysis of the meteorological data available from the Tar Sands area. The probabilities of occurrence of various meteorological parameters will be used as a basis for estimating the frequencies of occurrence and costs associated with...
-
1977-01-01
Nyborg, M., Takyi, S.K., Rowell, M.H., McGill, W.B.
One of the major environmental problems which arises with surface mining of the oil sands in the Fort McMurray-Fort MacKay area of Alberta is the permanent loss of the natural vegetation and the drastic change in the soils that supported it. It has been estimated that with a production target of...
-
1977
Strong Hall & Associates Ltd.
This study, initiated by Syncrude's Environmental Affairs Division, was undertaken: • to specify the objectives and structure of a socio-economic impact assessment program; • to determine information required to satisfy existing and anticipated requirements of government agencies and...