Search
Skip to Search Results- 12Estimation
- 2Geostatistics
- 1 Residential construction manufacturing
- 1AHRS
- 1Aided Navigation
- 1Anisotropy
- 1Azhin, Maryam
- 1Barczyk, Martin
- 1Boisvert, Jeff
- 1Cui, Tao
- 1Darwish, Mohammad
- 1Davila Saavedra, Luis A
- 3Deutsch, Clayton (Civil and Environmental Engineering)
- 2Jing, Yindi (Electrical and Computer Engineering)
- 2Stevan Dubljevic (Department of Chemical and Materials Engineering)
- 1Dr, Yasser Mohamed (Civil and Environmental Engineering)
- 1Dubljevic, Stevan (Chemical and Materials Engineering)
- 1Liu, Qi (Chemical and Material Engineering)
-
Applications of nonautonomous infinite-dimensional systems control theory for parabolic PDEs
DownloadFall 2013
Parabolic partial differential equations (PDEs) are used as models of transport-reaction phenomena in a variety of different industrial chemical and materials engineering processes, and can yield precise descriptions of process variables with complex temporal and spatially dependent system...
-
Spring 2024
The variogram characterizes the spatial variability of a regionalized variable. Variogram calculation and modeling require a significant amount of professional time. The variogram has a significant impact on estimation and simulation, and it has a considerable impact in the mining industry since...
-
Estimation, Soft Sensing and Servo-control of Linear Distributed and Lumped Parameter Systems
DownloadFall 2021
State-of-the-art advancements in the realm of industrial process control and monitoring often require accurate descriptions of complex processes and their dynamical behaviours. Usually, many industrial processes are described by partial differential equations (PDE) or ordinary differential...
-
Spring 2010
Many geological deposits contain nonlinear anisotropic features such as veins, channels, folds or local changes in orientation; numerical property modeling must account for these features to be reliable and predictive. This work incorporates locally varying anisotropy into inverse distance...
-
Implementation and Evaluation of Spatiotemporal Prediction Algorithms and Prediction of Spatially Distributed Greenhouse Gas Inventories
DownloadFall 2011
Growing environmental concerns require monitoring and modelling of greenhouse gases. These modelling efforts require processing of massive datasets in a timely fashion. This, in turn, can lead to feasibility problems when estimating values of missing data points. This thesis examines and compares...
-
Spring 2012
Experimentally-validated nonlinear flight control of a helicopter UAV has two necessary conditions: an estimate of the vehicle’s states from noisy multirate output measurements, and a nonlinear dynamics model with minimum complexity, physically controllable inputs and experimentally identified...
-
Fall 2020
Column flotation, as a selective separation process based on differences in surface properties, is used for a broad range of applications in the mineral processing industry, including metallic, non-metallic, and coal ores, as well as wastewater treatment over the last fifty years. Flotation is a...
-
Spring 2014
This thesis focuses on the power allocation during the channel training process for three cooperative relay networks: a one-way single-relay network, a one-way multi-relay network and a two-way single-relay network. For these three networks, under the amplify-and-forward (AF) scheme, we...
-
Predictive Control, Estimation and Sensor Placement of Large-Scale Transport-Reaction Systems
DownloadFall 2023
Advanced process control and monitoring rely on the accurate description of complex processes and their dynamic behaviors. Typically, numerous industrial processes are characterized by either partial differential equations (PDEs) or ordinary differential equations (ODEs), depending on whether...
-
Residential construction manufacturing estimating framework: the case of lightweight timber framing
DownloadFall 2020
The term industrialized construction was adopted by the offsite construction industry where the building components are prefabricated in factories and then transported to the construction site for on-site assembly. With this shift towards industrialized construction, new challenges were...