Residential construction manufacturing estimating framework: the case of lightweight timber framing
DownloadFall 2020
The term industrialized construction was adopted by the offsite construction industry where the building components are prefabricated in factories and then transported to the construction site for on-site assembly. With this shift towards industrialized construction, new challenges were...
-
Fall 2019
In the current practice, cabinets (in kitchen, bathroom, and closet) are designed and manufactured using different software and tools. Sales use simple visualization tools (i.e. Sketchup) to communicate with their clients while the same cabinets are re-drafted for estimation, permits, and...
-
A framework for offsite construction manufacturing process improvement through digitalization and automated real-time data collection
DownloadFall 2022
This thesis proposes methods to apply real-time data to improve manufacturing operations in offsite construction using a combination of tools such as simulation, machine learning, and exploratory data analysis. These methods are applied to increase flexibility in operations and digitalize the...
-
Fall 2010
Industrialization creates new requirements for design. Designers need to consider not only building performance, but also production plan needs. This requires a well-structured Building Information Model (BIM) to support the manufacturing needs for design and drafting. BIM, in combination with...
-
Spring 2017
Collaboration among project participants is key to the success of construction projects. When project information is not efficiently communicated or easily shared among project stakeholders, such conditions often lead to cost overruns and schedule delays. Particularly, this phenomenon can...
-
BIM-Based Data Mining Approach to Estimating Job Man-Hour Requirements in Structural Steel Fabrication
DownloadSpring 2015
In a steel fabrication shop, jobs from different clients and projects are generally processed simultaneously in order to streamline production processes, improve resource utilization, and achieve cost-effectiveness in serving multiple concurrent steel-erection sites. Reliable quantity takeoff on...
-
Spring 2020
The development of building information modelling has facilitated the improvement of cost and time management in panelized construction, one of the most popular and efficient methods for constructing residential buildings. However, in most cases, the drainage system is currently still installed...
-
Fall 2016
Survival data is mostly analyzed using Cox proportional hazards model to identify factors associated with survival time of patients. However recently random survival forest (RSF), a non-parametric method for ensemble estimation constructed by bagging of classification trees for survival data, is...
-
Fall 2010
The Wireless Sensor Networks (WSNs) have emerged as a new paradigm for collecting and processing data from physical environments, such as wild life sanctuaries, large warehouses, and battlefields. Users can access sensor data by issuing queries over the network, e.g., to find what are the 10...
-
Extracting and Integrating Industrial Construction Steel Trade Data in ill-formed BIM Models
DownloadFall 2017
Oil and gas are known for their huge-size and complex projects that consist of multiple trades’ subprojects such as concrete, steel, and piping. These subprojects are executed within a confined area during a limited time frame. This requires careful planning and coordination between these...