Collecting information is of vital importance for the development of a mineral project. The capital costs of mining projects are high and there is significant risk due to the available data. At all stages of a project, from exploration to mine closure, decisions need to be made that are based off...
-
Spring 2020
Blasting is widely used in mining operations as the primary comminution process to reduce the in-situ rock into fragmented material suitable for the subsequent transport and processing. The energy used is released from an explosive by detonation and transferred to the rock mass via a shock front...
-
An Improved Approach to Production Planning in Oil Sands Mining Through Detailed Analysis and Simulation of Cycle Times
DownloadFall 2018
The objective of this thesis is to develop, implement and verify a theoretical framework based on detailed analyses and simulation of truck and shovel cycle times in open pit mining, placing an emphasis on the hauling component of the cycle. The goal is to improve the generation of accurate and...
-
Fall 2023
Calculating and modeling a variogram from sparsely sampled data can be complex and time-consuming due to the need for expertise in selecting the appropriate parameters and fitting functions to the experimental variogram. To assist with variogram modeling, a novel approach based on Convolutional...
-
Comparison of 2D and 3D uncertainty quantification in geostatistical modeling in stratigraphic formations
DownloadFall 2023
Under suitable geological conditions and depending on the modeling goals at the project’s current phase, a geological modeler could justifiably choose to estimate natural resource concentrations by building geostatistical models on a 2D grid rather than a 3D grid. While the application of these...
-
Fall 2010
Modeling spatial variables involves uncertainty. Uncertainty is affected by the degree to which a spatial variable has been sampled: decreased spacing between samples leads to decreased uncertainty. The reduction in uncertainty due to increased sampling is dependent on the properties of the...
-
Spring 2021
Different quantities of information are available at various stages of the development of a mining project. Consequential decisions are made given the data available at the time. Geological uncertainty due to sparse data presents economic risks. The collection of additional information reduces...
-
Effects of Cyclical Load Conditions on Wear Rate and Wear Scar in a Modified ASTM G65 Abrasion Test
DownloadSpring 2016
Wear is an incredibly complicated phenomenon that can occur in many different forms, through a number of modes, facilitated by a variety of mechanisms. Surface mining operations are particularly afflicted by abrasive wear; principally during the excavation process. Shovel geometry has been...
-
Electric Rope Shovel Operation Enhancements, Understanding and Modelling the Impact of The Operator
DownloadSpring 2021
The loading and haulage system is considered a prominent part of a surface mine operation. Improving the system enhances the productivity and economics of an operation to a great extent. Operators play a critical role in the mine overall performance and production. Autonomous truck fleets have...
-
Fall 2016
Chrome carbide samples prepared using submerged arc welding procedures were subjected to physical abrasion testing in a modified machine similar to the ASTM G65 standard, in an investigation of media particle shape contribution to abrasive wear. The primary intent of this study was to determine...