Search
Skip to Search Results- 1AL-Alawi, Mubarak K
- 1Abdulrahim, Dana
- 1Ajweh,Ziad
- 1Al-Hussein, Riphay
- 1Alanjari, Pejman
- 1Altaf, Mohammed Sadiq
- 39Department of Civil and Environmental Engineering
- 9Department of Chemical and Materials Engineering
- 9Department of Mechanical Engineering
- 5Department of Computing Science
- 5Department of Electrical and Computer Engineering
- 2Department of Physics
- 5AbouRizk, Simaan (Civil and Environmental Engineering)
- 5Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 3Mohamed, Yasser (Civil and Environmental Engineering)
- 3Nikolaidis, Ioanis (Computing Science)
- 2AbouRizk, Simaan (Department of Civil and Environmental Engineering)
- 2Boulanger, Pierre (Computing Science)
-
Spring 2015
This research aims to assist in the assessment of tailings management technologies through the development of a dynamic simulation model. The developed model (TMSim) incorporates the mine plan, various stages of dewatering including classification, pre- and post-deposition dewatering, and an...
-
Fall 2009
The present work deals with the development of a direct simulation strategy for solving the motion of spherical particles in non-Newtonian liquids. The purely viscous (non-elastic) non-Newtonian liquids are described by Bingham and thixotropy models. Validation of the strategy is performed for...
-
Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework
DownloadFall 2011
Simulation modeling is a strong tool that has not been utilized to its expected potential in day to day construction industry activities. One of the reasons contributing to that is the inability of simulation models to depict changes in site space in an intuitive way. This research tries to...
-
Spring 2016
Renewal of damaged and worn pipes is becoming a significant maintenance concern for municipalities in North America as many collection systems (water and wastewater underground infrastructure) have reached beyond the ends of their service lives. Cured-in-place pipe (CIPP) rehabilitation is one of...
-
Fall 2010
A laboratory experiment and a numerical simulation of a dual well pair SAGD process with live bitumen were conducted to examine operating strategies on the recovery performance of a multiple well pair SAGD process. The experiment was successfully carried out under such operation strategies as...
-
Finite Element Model of the Thermal Profile During Submerged Arc Welding with One and Two Electrodes
DownloadFall 2016
The submerged-arc welding (SAW) process is used extensively in the manufacturing of pipes. The heat flow introduced by the welding operation has a significant impact on the properties of both the weld metal and the heat affected zone (HAZ). The work presented in this thesis aims to develop a...
-
Spring 2018
Crew performance is influenced not only by the environment where construction activities occur, but also by crew motivation, which has largely been overlooked in construction research. For many years, construction engineering researchers have observed that motivational differences within...
-
Spring 2010
Many geological deposits contain nonlinear anisotropic features such as veins, channels, folds or local changes in orientation; numerical property modeling must account for these features to be reliable and predictive. This work incorporates locally varying anisotropy into inverse distance...
-
Fall 2012
Project risks and uncertainties cause unpredictable project performance. This research intended to demonstrate that project control can be improved with the proceeding of a project, by exploiting new, available project information, and reducing uncertainties. The purpose of this study was to...
-
Improving the Efficiency, Productivity, and Cost-Effectiveness of Modular Design and Construction Processes
DownloadSpring 2012
This thesis provides a methodology to incorporate building information modeling (BIM), lean construction, and simulation modelling into a cohesive package in the context of modular manufacturing. BIM was used to construct a three dimensional model from which the wall and object properties were...