Search
Skip to Search Results- 3Hasan, Md Monjurul
- 3Kostic, Branislav Z
- 3Yu, Miao
- 2Afifi, Mona
- 2Altaf, Mohammed Sadiq
- 2Alwisy, Aladdin
- 31Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 25Deutsch, Clayton (Civil and Environmental Engineering)
- 23AbouRizk, Simaan (Civil and Environmental Engineering)
- 20Chalaturnyk, Rick (Civil and Environmental Engineering)
- 20Liu, Yang (Civil and Environmental Engineering)
- 18Bayat, Alireza (Civil and Environmental Engineering)
-
Initial adhesion of EPS producing bacteria Burkholderia cepacia – the impact of cranberry juice
DownloadFall 2010
The impact of cranberry juice was investigated with respect to the initial adhesion of three isogenic Burkholderia cepacia bacteria with different extracellular polymeric substance (EPS) producing capacities: a wild-type cepacian EPS producer PC184, mutant bacteria PC184rml with reduced EPS...
-
INITIAL IMPERFECTIONS OF HIGH STRENGTH UOE MANUFACTURED STEEL PIPES AND THEIR EFFECTS ON PIPE BUCKLING
DownloadFall 2014
The use of high strength steel pipes in the pipeline industry is increasing due to its cost reduction benefits. The development of high steel grades has enabled the manufacturing of line pipes with large diameter to thickness ratios. The high strength large diameter pipes are commonly...
-
Fall 2021
Initial solubilities for whole bitumen and bitumen cuts of light gas oil (LGO), heavy gas oil (HGO), and vacuum residue (resid) were measured in supercritical carbon dioxide (SC-CO2) and SC-CO2 modified with 5 or 15 mol% toluene. The initial solubility measurements were performed on a bench-scale...
-
Spring 2016
Industrial fabrication for modular installations has its own set of challenges that combine the environments of industrial manufacturing and off-site construction. This hybrid execution strategy means that fabricators need to look at both fields and adopt the best tools and techniques. This...
-
Integer-Programming-Assisted Path-Float-Based Method for Time-Cost Tradeoff Optimization in Project Planning
DownloadFall 2019
In theory, time-cost tradeoff (TCT) optimization is a classic planning problem appealing to construction management; yet, existing analytical methods are found inadequate to make a significant impact in practice. Heuristic methods lack a theoretical basis to ensure arriving at optimum solutions...
-
Spring 2012
Poor staircase architectural design could contribute to increasing the risk of falling for older adults. This research provides an integrated evidence-based assessment of staircase architectural design to support independent living for older adults (65 years and older). The staircase assessment...
-
Fall 2019
In Canada, demand for automated construction manufacturing has increased, and, consequently, there has been an increase in the demand for automated manufacturing systems. An opportunity exists in Canada to tap into the growing market for automated manufacturing systems; however, there is limited...