This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 3Hasan, Md Monjurul
- 3Yu, Miao
- 2Afifi, Mona
- 2Altaf, Mohammed Sadiq
- 2Alwisy, Aladdin
- 2Barkokebas, Beda
- 35Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 26Deutsch, Clayton (Civil and Environmental Engineering)
- 23AbouRizk, Simaan (Civil and Environmental Engineering)
- 23Chalaturnyk, Rick (Civil and Environmental Engineering)
- 22Liu, Yang (Civil and Environmental Engineering)
- 18Bayat, Alireza (Civil and Environmental Engineering)
-
Fall 2015
Active bottlenecks limit traffic flow on freeway corridors. To relieve bottleneck severity, ramp metering (RM), variable speed limit (VSL) and their integration are often implemented to control the on-ramp and mainline input flow. Currently, freeway operation has become proactive based on...
-
Fall 2013
Laydown yard management is comprised of planning and controlling of all necessary efforts to ensure that the correct quantity of materials are available where and when they are needed on construction storage yards. Applying the right material management methodology in construction projects would...
-
Fall 2009
Natural attenuation refers to the observed reduction in contaminant concentration via natural processes as contaminants migrate from the source into environmental media. Assessment of the dimensions of contaminant plumes and prediction of their fate requires predictions of the rate of dissolution...
-
Fall 2018
Tabular vein deposits represent important projects and mining operations worldwide. Mining cost are high and are impacted by uncertainty in the geometry of the vein. Uncertainty can influence mine planning and operation. For this thesis, simple tabular vein structures with single or multiple...
-
Fall 2016
Modular construction has gained momentum in North America as an emerging construction paradigm in recent years. Modular buildings are assembled from components that are prefabricated in manufacturing plants and transported to the construction site for assembly. The current manual-based approach...
-
Fall 2017
For trajectory-based travel time prediction model, map matching shows its excellence in terms of GPS data processing by providing an efficient technique to generate the vehicle trajectory on the digital map. The transit vehicle trajectory contains essential information about arrival time at bus...