Search
Skip to Search Results- 6Geotechnical and Geoenvironmental Engineering Program
- 5Civil and Environmental Engineering, Department of
- 4Civil and Environmental Engineering, Department of/Presentations (Civil & Environmental Engineering)
- 3Geotechnical and Geoenvironmental Engineering Program/Conference Proceedings (Geotechnical & Geoenvironmental Engineering)
- 3Geotechnical and Geoenvironmental Engineering Program/Other Research Publications (Geotechnical & Geoenvironmental Engineering)
- 1Civil and Environmental Engineering, Department of/Research Materials (Civil & Environmental Engineering)
-
2018-11-20
Traditionally, multi-disciplinary modelling exercises involve one discipline mechanistically using the output from a black-box model developed by another discipline. To address this deficiency, the research uses techniques relatively new to the geotechnical community, such as System Dynamics (SD)...
-
2022-10-05
Reclamation of slurry materials such as mine tailings requires effective management of consolidation-induced water release in the long-term. This is particularly challenging for flocculated or thickened tailings which require excessive time to fully consolidate to the final landform due to their...
-
2018-09-23
A system dynamics (SD) model was developed in the Tailings Management Simulator (TMSim) to simulate consolidation processes under quiescent conditions. A top-down iterative approach guides the overall philosophy of the modelling process. The GoldSim software was used as the main simulation...
-
2018-10-02
Tailings Management System (TMS) consists of a web of inter-related sub-systems across disciplinary and organizational boundaries. Conventional predictive models simulate physical processes in each discipline with great details. In contrast, simulation based on System Dynamics (SD) focuses on...
-
TMSim Consol Benchmark Data
2023-10-14
Benchmarking dataset against UNSATCON (Carleton University), SoilVision (Bentley) and CONDENS0 (University of Colorado Boulder). GoldSim Player Version 12 is required to view the model file. Note that the unit for Ksat is in m/day.
-
TMSim_Consol
2021-06-04
Implemented in GoldSim, TMSim_Consol uses an explicit finite difference method to calculate the void ratio at each time step. Excess pore pressure and effective stress in each layer are then derived from void ratio. In addition to the specific gravity (Gs) and geometric properties of the deposit,...