This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 9Fuzzy logic
- 6Construction
- 4System dynamics
- 3Crew performance
- 2Agent-based modeling
- 2Construction modeling
- 9Fayek, Aminah Robinson
- 5Raoufi, Mohammad
- 3Seresht, Nima Gerami
- 1Gebretekle, Yisshak Tadesse
- 1Kamau, Daniel Waweru
- 1Kedir, Nebiyu Siraj
-
Digitalization Opportunities Road Mapping Tool (DORMT©): A framework to assess digitalization opportunities in construction organizations
Download2021-04-13
Gebretekle, Yisshak Tadesse, Kamau, Daniel Waweru, Raoufi, Mohammad, Fayek, Aminah Robinson
The construction industry is entering the digital age, which offers innovative digitalization opportunities (DOs) regarding cost efficiency, project management, and improved client experience. In their early efforts to implement DOs, construction organizations have had varying degrees of success,...
-
Dynamic modeling of multi-factor construction productivity for equipment-intensive activities.
Download2018-07-12
Seresht, Nima Gerami, Fayek, Aminah Robinson
Construction productivity is a major research interest within the construction domain. Because construction is a labor-intensive industry, previous research has often focused on construction labor productivity (CLP). However, equipment is the main driver of productivity for some construction...
-
2018-01-01
Raoufi, Mohammad, Fayek, Aminah Robinson
Recently, agent-based modeling (ABM) has been used to model construction processes and practices because it is capable of handling some of the complexities that arise from the interactions of system components. However, ABM alone cannot take into account the subjective uncertainty that exists in...
-
Fuzzy Agent-Based Multicriteria Decision-Making Model for Analyzing Construction Crew Performance
Download2020-01-01
Kedir, Nebiyu Siraj, Raoufi, Mohammad, Fayek, Aminah Robinson
Selecting economically feasible policies for maximizing crew motivation and performance is a multifaceted problem, and each aspect of the process poses considerable unique challenges for construction practitioners. Fuzzy agent-based modeling (FABM) addresses some of the challenges of predicting...
-
2020-03-01
Raoufi, Mohammad, Fayek, Aminah Robinson
The use of agent-based modeling (ABM) in the analysis of construction processes and practices has increased significantly over the last decade. However, the developed models are not able to address both random and subjective uncertainties that exist in many construction processes and practices....
-
Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction
Download2021-01-01
Raoufi, Mohammad, Fayek, Aminah Robinson
Purpose – This paper aims to cover the development of a methodology for hybrid fuzzy Monte Carlo agentbased simulation (FMCABS) and its implementation on a parametric study of construction crew performance. Design/methodology/approach – The developed methodology uses fuzzy logic, Monte Carlo...
-
Hybrid fuzzy system dynamics model for analyzing the impacts of interrelated risk and opportunity events on project contingency
Download2020-07-23
Siraj, Nasir B., Fayek, Aminah Robinson
Traditional risk analysis techniques are ineffective for capturing the dynamic causal interactions and subjective uncertainties involved in assessing risk and opportunity events since they treat risks independently and rely on the availability of sufficient historical data. In this paper, a...
-
2021-08-03
Seresht, Nima Gerami, Fayek, Aminah Robinson
Predicting and optimizing performance in earthmoving operations is critical, because they are essential to many construction projects. The complexity of modeling earthmoving operations remains challenging, even with several modeling techniques available, including simulation. This paper advances...
-
2020-08-01
Seresht, Nima Gerami, Fayek, Aminah Robinson
The performance of construction systems (e.g., activities, operations, projects) is commonly measured using different indicators, such as productivity or production rate. The accurate prediction of performance, which is an important concern of construction researchers and practitioners, requires...