Search
Skip to Search Results- 6Vaartnou, H.
- 5Stewart Weir Stewart Watson & Heinrichs
- 5Wheeler, G. W.
- 4Conservation and Utilization Committee
- 4Land Conservation and Reclamation Council
- 4Mayhood, D. W.
-
1982
This project undertook an assessment of the potential for using satellite imagery to determine water quality parameters in the southwest end of Lake Athab8sca and to provide a mathematical model capable of simulating the circulation patterns in this area of the lake. A substantial amount of field...
-
Mycorrhizal studies regarding the reclamation of oil sand tailings: Production and outplanting of jack pine seedlings and amounts of VA- and ectomychrrhizal inoculum in stockpiled peat
Download1984
The major objectives of the ectomycorrhizal studies were to produce mycorrhizal jack pine seedlings in the greenhouse and to initiate a field study on the Syncrude dyke on the effect of different ectomycorrhiza1 fungi on the growth of jack pine. In addition, a simple inoculation technique which...
-
Northern river basins ecological and human health studies: Summary, relevance and recommendations
Download1999
Northern River Basins Human Health Monitoring Program Management Committee
The Northern River Basins Human Health Monitoring Program (the Health Program) was established in November 1994 to examine possible relationships between various environmental risk factors (including lifestyle factors as well as biological and chemical contaminants) and the health of northern...
-
1999
This report examines the differences in health outcomes across the province and compares the Northern River Basin Study area with the other areas of the province and examines possible relationships between health outcomes and environmental contaminants. The report includes a series of regional...
-
Oil sand overburden characterization within the mine area of Syncrude Lease No. 17 for reclamation of spent oil sand
Download1976
For the establishment and growth of plants, spent oil sand lacks Ca, K, NO3-N, available P, Zn, CEC and available water storage capacity. Cu, Mn and possibly SO4-S are marginally adequate in spent sand. Oil sand overburden materials within the mine area of Syncrude Lease No. 17 were sampled and...
-
Oil sands reclamation: A study integrating mining, tailings disposal and reclamation. Volume I - Text
Download1979
Rheinbraun - Consulting GmbH, Techman Ltd.
The document provides a comprehensive review of the technical problems facing future oil sands developments and suggests options which will be helpful in formulating oil sands mining, tailings disposal and reclamation plans. By providing in-depth cost analysis for many of the activities...
-
Oil sands reclamation: A study integrating mining, tailings disposal and reclamation. Volume II - Drawings
Download1979
Techman Ltd., Rheinbraun - Consulting GmbH
The document provides a comprehensive review of the technical problems facing future oil sands developments and suggests options which will be helpful in formulating oil sands mining, tailings disposal and reclamation plans. By providing in-depth cost analysis for many of the activities...
-
Oil sands reclamation: A study integrating mining, tailings disposal and reclamation. Volume III – Yearly cost estimates
Download1979
Techman Ltd., Rheinbraun - Consulting GmbH
The document provides a comprehensive review of the technical problems facing future oil sands developments and suggests options which will be helpful in formulating oil sands mining, tailings disposal and reclamation plans. By providing in-depth cost analysis for many of the activities...
-
1979
This reports covering the results of the 1977 research, adds significantly to the earlier findings. It is always difficult to predict long term plant responses on only a few years of data; in this case, only two years. Climatically the two summers (May - August) were very similar, with the mean...
-
Preliminary compatibility studies of G.C.O.S. sand tailings pond water with Athabasca River
Download1968
Alberta Health, Environmental Health Services Division
On May 30, 1968 G.C.O.S requested permission to discharge 110 x 106 ft3 of effluent from the sands tailings pond at the Fort McMurray site into the Athabasca River during periods of high river flow. G.C.O.S. outlined the events which made this request necessary in order that an adequate base be...