This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 2Heinz, Heinrich Karl.
- 1Branco, Paulo
- 1Clementino, Renato Viana.
- 1Da Fontoura, Sergio A. B.
- 1Hutchinson, David Edward
- 1Kaiser, Peter Konrad
-
Enabling Flexible Electronics: Demonstration of the Tunneling Junction Transistor (TJT) and Flexible Circuit Elements
DownloadSpring 2018
Thin-film technology continues to evolve as it finds new technological spaces to fulfill that will inevitably lead to an increased integration between society and technology. The aims of this research are to push beyond the limits of thin film electronics to enable a new era of flexible...
-
Methodology for Project Schedule Acceleration Integrated with Energy Source-Based Assessment of Occupational Health and Safety Risks
DownloadFall 2022
There will always be uncertainties and hazards involved with project activities in the construction industry. Both long-term and short-term safety events reported to occupational health and safety authorities are impacted by the practice of schedule compression by crashing the project activities....
-
Spring 2017
We present the characterization of close-spaced linear dangling bond structures, or dangling bond chains, two to seven dangling bonds long, on a hydrogen terminated silicon (100)-2x1 surface using a scan- ning tunnelling microscope. Constant height differential conductance maps reveal their local...
-
Spring 2024
THz optics and scanning probe microscopy (SPM) techniques have gone through several decades of development, enabling numerous research studies and applications related to ultrafast phenomena at the nanoscale. Advancements in THz technology enable physical processes in materials to be identified...
-
The Application of Front End Planning and Special Purpose Simulation Templates to Drainage Tunnel Construction
DownloadSpring 2015
The Construction Industry Institute (CII) has a best practice under the heading “Front End Planning” (1995) that is meant to ensure that projects are as complete, as optimized, and as certain as possible throughout the project life cycle. In order to demonstrate this, the Project Definition...