Search
Skip to Search Results- 1AL-Alawi, Mubarak K
- 1Ajweh,Ziad
- 1Al-Hussein, Riphay
- 1Alanjari, Pejman
- 1Altaf, Mohammed Sadiq
- 1Alvanchi, Amin
- 5AbouRizk, Simaan (Civil and Environmental Engineering)
- 5Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 3Mohamed, Yasser (Civil and Environmental Engineering)
- 2AbouRizk, Simaan (Department of Civil and Environmental Engineering)
- 2Deutsch, Clayton (Civil and Environmental Engineering)
- 1AL-Hussein, Mohamed (Civil & Environmental Engineering)
-
Reservoir and geomechanical coupled simulation of CO2 sequestration and enhanced coalbed methane recovery
DownloadFall 2009
Coalbeds are an extremely complicated porous medium with characteristics of heterogeneity, dual porosity and stress sensitivity. In the past decades great achievements have been made to the simulation models of pressure depletion coalbed methane (CBM) recovery process and CO2 sequestration and...
-
Fall 2009
Geostatistical techniques are used to estimate recoverable reserves at unsampled locations and to quantify uncertainty. Several variables are often measured and important for reserve evaluation. Using more variables improves the quality of modeling, but quantifying the relationships between the...
-
Fall 2010
The allocation of resources over time, referred to as resource scheduling, in large-scale construction environments is a challenging problem. Although traditional network scheduling techniques are the most popular scheduling techniques in the construction industry, they are ineffective in...
-
Spring 2010
The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than...
-
Fall 2010
A laboratory experiment and a numerical simulation of a dual well pair SAGD process with live bitumen were conducted to examine operating strategies on the recovery performance of a multiple well pair SAGD process. The experiment was successfully carried out under such operation strategies as...
-
Spring 2010
Many geological deposits contain nonlinear anisotropic features such as veins, channels, folds or local changes in orientation; numerical property modeling must account for these features to be reliable and predictive. This work incorporates locally varying anisotropy into inverse distance...
-
Fall 2010
Simulation is often used to model production processes with the aim of understanding and improving them. In many cases, however, information produced by simulation is not detailed enough and can be misinterpreted. The use of visualization in combination with simulation can provide project...
-
Spring 2010
Rodriguez-de la Torre, Rhamid Hortensia
Since oil and gas production from conventional fields is decreasing, the produc-tion of unconventional hydrocarbon reservoirs is becoming imperative, where geo-mechanical responses play an important role. This research presents a methodology that starts exploring the inclusion of geomechanics in...
-
Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework
DownloadFall 2011
Simulation modeling is a strong tool that has not been utilized to its expected potential in day to day construction industry activities. One of the reasons contributing to that is the inability of simulation models to depict changes in site space in an intuitive way. This research tries to...
-
The application of simulation methodologies on estimating gas emissions from construction equipment
DownloadSpring 2011
Construction contributes significantly to gas emissions. Diverse efforts have been undertaken to mitigate the effects of these emissions; however, there currently is no effective tool to estimate small-scale (e.g., project-based) emissions in construction. Discrete-event simulation (DES), a new...