Search
Skip to Search Results- 3Hasan, Md Monjurul
- 3Kostic, Branislav Z
- 3Yu, Miao
- 2Afifi, Mona
- 2Altaf, Mohammed Sadiq
- 2Alwisy, Aladdin
- 35Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 26Deutsch, Clayton (Civil and Environmental Engineering)
- 23AbouRizk, Simaan (Civil and Environmental Engineering)
- 23Chalaturnyk, Rick (Civil and Environmental Engineering)
- 22Liu, Yang (Civil and Environmental Engineering)
- 18Bayat, Alireza (Civil and Environmental Engineering)
-
Fall 2017
This thesis proposes a method for assessing the indoor environment of a library—more specifically, how conducive a library’s indoor environment is to studying. The method involves the integration of tree analysis and the tallying heuristic function. A tree model is necessary in order to establish...
-
An integrated stochastic multi-objective simulation and optimization framework for fuel-efficient truck dispatching in open-pit mines
DownloadFall 2023
In the context of open-pit mining, the haulage system plays a pivotal role in the overall environmental impact of the operation, particularly concerning greenhouse gas (GHG) emissions and energy consumption. This impact stems from the heavy reliance on trucks for the transportation of materials...
-
Spring 2012
Cost and schedule integration can improve efficiencies in construction planning and control since they are key constraints in project delivery and closely related. This research provides a framework for cost and schedule integration, and transforms the model to simulation-based planning in which...
-
Fall 2011
Off-site structural steel fabrication has become increasingly popular in industrial construction projects over the past decade due to advantages of higher productivity, better quality, better safety and improved time and cost effectiveness. The fast paced nature of off-site structural steel...
-
An Integrated Optimization Model for Strategic Open-Pit Mine Planning and Tailings Management
DownloadFall 2014
Badiozamani Tari Nazari, Mohammad Mahdi
A strategic mine planning model determines the best order of extraction and destination of material over the mine-life, in a way that maximizes the net present value of the produced minerals. In case of oil sands open-pit mining, further processing of the extracted oil sands generates massive...
-
An Integrated Framework for Managing Labour Resources Data in Industrial Construction Projects: A Knowledge Discovery in Data (KDD) Approach
Download2009
Improper management of labour resources causes major problems for companies working on multiple industrial construction projects. To address these problems, an integrated framework is developed based on a five-step knowledge discovery in data model. The framework transfers existing...
-
An Integrated Framework for Balancing Contractor's Workload versus Capacity using System Dynamics
DownloadSpring 2023
Elnady, Ahmed Abdelrady Okasha Mohamed
Workload fluctuation is one of the major challenges facing contracting (project-based) organizations because of the rational decision-making model applied to manage it in current practice. The rational model balances the workload with the capacity required at the level of activity, ignoring the...