Search
Skip to Search Results- 1772Department of Civil and Environmental Engineering
- 368Department of Political Science
- 214Department of Medical Sciences
- 72Department of Public Health Sciences
- 12Department of Laboratory Medicine and Pathology
- 12Department of Oncology
- 3Hasan, Md Monjurul
- 3Kostic, Branislav Z
- 3Yu, Miao
- 2Abiew, Francis Kofi
- 2Afifi, Mona
- 2Altaf, Mohammed Sadiq
- 31Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 25Deutsch, Clayton (Civil and Environmental Engineering)
- 23AbouRizk, Simaan (Civil and Environmental Engineering)
- 20Chalaturnyk, Rick (Civil and Environmental Engineering)
- 20Liu, Yang (Civil and Environmental Engineering)
- 18Bayat, Alireza (Civil and Environmental Engineering)
-
Fall 2016
Variable Speed Limit (VSL), an active traffic demand management (ATDM) strategy, is widely exercised to improved freeway operations by influencing collective driving pattern during congested condition. Since high traffic flow coupled with elevated lane changing rate can onset congestion on...
-
Spring 2014
Over the past few decades, several active traffic control methods have been developed and implemented to mitigate freeway congestion. Among them, Variable Speed Limit (VSL) is considered the most efficient control method. In addition, the latest advances in Intelligent Transportation Systems...
-
Fall 2023
Most of Canada’s municipal infrastructure, including bridges, was built between the 1950s and 1970s. With design lives of 50-100 years, many of these structures are due for major rehabilitations or replacements. With the growing costs of deteriorating infrastructure, the cost savings from...
-
Virtual Reality-based Human Factor Analyses for Ergonomic Improvements in Construction Manufacturing Facilities
DownloadFall 2022
Dias Ferreira Barkokébas, Regina Celi
In construction manufacturing, components (e.g., panels or modules) are produced in a factory environment before being transported and installed in a construction site. In this context, two distinct operational phases are observed: factory, accounting for 60%–90% of the tasks that would typically...