This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Theses and Dissertations
This collection contains theses and dissertations of graduate students of the University of Alberta. The collection contains a very large number of theses electronically available that were granted from 1947 to 2009, 90% of theses granted from 2009-2014, and 100% of theses granted from April 2014 to the present (as long as the theses are not under temporary embargo by agreement with the Faculty of Graduate and Postdoctoral Studies). IMPORTANT NOTE: To conduct a comprehensive search of all UofA theses granted and in University of Alberta Libraries collections, search the library catalogue at www.library.ualberta.ca - you may search by Author, Title, Keyword, or search by Department.
To retrieve all theses and dissertations associated with a specific department from the library catalogue, choose 'Advanced' and keyword search "university of alberta dept of english" OR "university of alberta department of english" (for example). Past graduates who wish to have their thesis or dissertation added to this collection can contact us at erahelp@ualberta.ca.
Items in this Collection
- 1AL-Alawi, Mubarak K
- 1Ajweh,Ziad
- 1Al-Hussein, Riphay
- 1Alanjari, Pejman
- 1Altaf, Mohammed Sadiq
- 1Alvanchi, Amin
- 5AbouRizk, Simaan (Civil and Environmental Engineering)
- 5Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 3Mohamed, Yasser (Civil and Environmental Engineering)
- 2AbouRizk, Simaan (Department of Civil and Environmental Engineering)
- 2Deutsch, Clayton (Civil and Environmental Engineering)
- 1AL-Hussein, Mohamed (Civil & Environmental Engineering)
-
Fall 2016
Grade control establishes the final destinations for mined material (plant, stockpile, waste dump, etc.) at the time of mining. Correct decisions bring profit to a mining company while incorrect decisions bring losses. There are several potential sources of misclassification of mined material: i)...
-
Lean-Mod: An Approach to Modular Construction Manufacturing Production Efficiency Improvement
DownloadSpring 2014
Modular construction manufacturing (MCM) is superior to the current on-site construction system which is hampered by inefficiency and material and process waste. Modular buildings are potentially built through a more efficient and cost-effective method, but in the current manufacturing-based...
-
Mineral Resource Classification and Drill Hole Optimization Using Novel Geostatistical Algorithms with a Comparison to Traditional Techniques
DownloadSpring 2015
The classification of mineral resources must follow standards that were created to regulate the public disclosure of projects assisting investors and their advisers in making investment decisions and preventing the publication of erroneous, misleading and fraudulent information. The definition of...
-
Fall 2012
The earthwork operations for reclamation add challenges and complications to common earthworks schedule and aspects such as placement locations and hauling routes…etc. The reclamation earthworks require that the soil layers structure before disturbing the land must remain the same after...
-
Nonlinear state-space control design for displacement-based real-time testing of structural systems
DownloadSpring 2011
Moosavi Nanehkaran, Seyed Abdol Hadi
This study presents the nonlinear design of a state space controller to control hydraulic actuators under displacement control, specifically for real-time pseudo-dynamic testing applications. The proposed control design process uses the nonlinear state space model of the dynamics of the system to...
-
Spring 2010
The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than...
-
Fall 2013
Laydown yard management is comprised of planning and controlling of all necessary efforts to ensure that the correct quantity of materials are available where and when they are needed on construction storage yards. Applying the right material management methodology in construction projects would...
-
Re-Sampling the Ensemble Kalman Filter for Improved History Matching and Characterizations of Non-Gaussian and Non-Linear Reservoir Models
DownloadSpring 2015
Reservoir simulation models play an important role in the production forecasting and field development planning. To enhance their predictive capabilities and capture the uncertainties in model parameters, stochastic reservoir models should be calibrated to both geologic and flow observations. The...
-
Reservoir and geomechanical coupled simulation of CO2 sequestration and enhanced coalbed methane recovery
DownloadFall 2009
Coalbeds are an extremely complicated porous medium with characteristics of heterogeneity, dual porosity and stress sensitivity. In the past decades great achievements have been made to the simulation models of pressure depletion coalbed methane (CBM) recovery process and CO2 sequestration and...
-
Fall 2012
This thesis describes a methodology for process improvement of panelized home building production lines through increasing productivity and reducing production cycle time based on lean production and simulation tools. In panelized home building, panels are produced in a factory and then moved to...