Search
Skip to Search Results- 91Oil Sands Research and Information Network (OSRIN)
- 60Oil Sands Research and Information Network (OSRIN)/Syncrude Canada Ltd. Reports
- 14Oil Sands Research and Information Network (OSRIN)/AOSERP Reports
- 7Oil Sands Research and Information Network (OSRIN)/OSRIN Technical Reports
- 5Oil Sands Research and Information Network (OSRIN)/RRTAC Reports
- 4Oil Sands Research and Information Network (OSRIN)/Government of Alberta Reports
-
1996-01-01
The Aurora Mine is planned for development in four stages of investment in bitumen production. Each stage includes a high capacity (8000 tonnes per hour) Low Energy Extraction Process utilizing hydrotransport. The first two stages (Aurora North) share a common truck-shovel mine pit on Oil Sands...
-
Baseline Growth Performance Levels and Assessment Procedures for Commercial Tree Species in Alberta's Mountains and Foothills
Download1988
W.R. Dempster and Associates Ltd.
Field work was undertaken on cut-over or burned sites during the summer of 1986 to acquire data on juvenile height development of commercial tree species growing in coal-bearing areas of the Eastern Slopes of Alberta. These data were used to define reasonable expectations of early growth...
-
1977
Grant, W., Tsui, P., Green, R., McCart, P.
This is a report of baseline studies of aquatic environments in the Athabasca River. These studies were carried out at the request of Syncrude Canada Limited and were focused in the vicinity of Syncrude's Lease Number 17, which borders the west bank of the Athabasca River north of the town of...
-
1978
Grant, W., Tripp, D., McCart, P., Tsui, P., Green, R.
Syncrude Canada Ltd. is producing synthetic crude oil from a surface mine on the eastern portion of Crown Lease 17, Alberta. Aquatic Environments Limited was commissioned to survey the MacKay River which crosses Leases 17 and 22, also held by Syncrude. The survey is intended to provide a...
-
1973
The study reported here was initiated on July 26, 1971, to provide ecological baseline information on Beaver Creek. Field surveys were carried out from August 7th to August 24th. Of particular interest to this study was the acquisition of quantitative data on fisheries populations as a means of...
-
1985
Migration watches were conducted from 21 August to 15 October 1984 near the site of Syncrude Canada Ltd.' s bitumen mining, extraction and upgrading development north of Fort McMurray, Alberta. These watches were undertaken to complement studies of birds using the waterbodies in the area of the...
-
1977
The conservation equations governing buoyant plume rise are solved for the case of non-uniform wind conditions. A simple power law is selected to represent the actual wind profile. Analytical solutions are presented both for uniformly stable and neutral atmospheric conditions. These solutions...
-
Calculations of annual averaged sulphur dioxide concentrations at ground level in the AOSERP study area
Download1977
The Climatological Dispersion Model and the input data required for calculation of annual averaged values of sulphur dioxide concentrations at ground level are described. The most important meteorological input to the model is the long-term joint frequency distribution of winds in the vicinity of...
-
1979
The random fluctuations of concentration levels in a plume is studied using a wind tunnel simulation of dispersion in the neutrally stable atmospheric boundary layer. A fast response hot - film probe is developed and used to measure high frequency fluctuations of helium tracer concentration in...