This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 3Fuzzy logic
- 3System dynamics
- 2Construction modeling
- 1Construction equipment
- 1Construction productivity
- 1Discrete event simulation
-
Dynamic modeling of multi-factor construction productivity for equipment-intensive activities.
Download2018-07-12
Seresht, Nima Gerami, Fayek, Aminah Robinson
Construction productivity is a major research interest within the construction domain. Because construction is a labor-intensive industry, previous research has often focused on construction labor productivity (CLP). However, equipment is the main driver of productivity for some construction...
-
2021-08-03
Seresht, Nima Gerami, Fayek, Aminah Robinson
Predicting and optimizing performance in earthmoving operations is critical, because they are essential to many construction projects. The complexity of modeling earthmoving operations remains challenging, even with several modeling techniques available, including simulation. This paper advances...
-
2020-08-01
Seresht, Nima Gerami, Fayek, Aminah Robinson
The performance of construction systems (e.g., activities, operations, projects) is commonly measured using different indicators, such as productivity or production rate. The accurate prediction of performance, which is an important concern of construction researchers and practitioners, requires...