Search
Skip to Search Results- 17Syncrude Canada Ltd.
- 3Canada’s Oil Sands Innovation Alliance
- 3Djurfors, S.
- 3Grant, W.
- 3McCart, P.
- 3Rowell, M.J.
-
1984
Concord Scientific Corporation
Concord Scientific Corporation has conducted a study of emissions from the main stack at Syncrude Canada Limited’s Mildred Lake plant. The terms of reference for this study were: • To carry out a field stack sampling program and associated chemical analyses to determine selected metallic elements...
-
A study of potential ice fog and low temperature water fog occurrence at Mildred Lake, Alberta
Download1976
In early 1976 a literature review of low temperature fog was carried out so that the potential for this fog type in the vicinity of the Syncrude synthetic crude oil complex could be assessed. Moreover, a site visit under suitable synoptic meteorological conditions was made in early March 1976 to...
-
A study of the chemical and physical properties of Syncrude's tailings pond, Mildred Lake, 1980
Download1981
Selected chemical and physical properties of the tailings pond were examined in 1980. The distributions of specific variables with depth and season within the tailings pond were determined (temperature, pH, conductivity, suspended particulate matter, total solids, bitumen, major anions, major...
-
1977
A network of 56 permanent plots, radiating from the periphery of the Syncrude Lease, was established during the summer of 1976. This network will allow continuous quantitative monitoring of the lichen flora using photographic techniques. Since lichens are highly sensitive to air pollutants such...
-
1978
Amoco Canada Petroleum Company Ltd., Chevron Standard Limited, Dome Petroleum Limited, Gulf Canada Limited, Hudson's Bay Oil and Gas Company Limited, Pacific Petroleums Ltd., Petrofina Canada Ltd., Shell Canada Resources Limited and Shell Explorer Limited, (collectively called the \"Applicant\")...
-
1985
Atmospheric emissions from oil sands plants are regulated by government. Both Syncrude Canada Ltd. and Suncor Inc. independently operate emission and air quality monitoring and reporting systems. The systems include air quality monitoring trailers and sulphation cylinder stations. In addition...
-
1996-01-01
The Aurora Mine is planned for development in four stages of investment in bitumen production. Each stage includes a high capacity (8000 tonnes per hour) Low Energy Extraction Process utilizing hydrotransport. The first two stages (Aurora North) share a common truck-shovel mine pit on Oil Sands...
-
1977
Grant, W., Tsui, P., Green, R., McCart, P.
This is a report of baseline studies of aquatic environments in the Athabasca River. These studies were carried out at the request of Syncrude Canada Limited and were focused in the vicinity of Syncrude's Lease Number 17, which borders the west bank of the Athabasca River north of the town of...