Search
Skip to Search Results- 3Hasan, Md Monjurul
- 3Kostic, Branislav Z
- 3Yu, Miao
- 2Afifi, Mona
- 2Altaf, Mohammed Sadiq
- 2Alwisy, Aladdin
- 31Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 25Deutsch, Clayton (Civil and Environmental Engineering)
- 23AbouRizk, Simaan (Civil and Environmental Engineering)
- 20Chalaturnyk, Rick (Civil and Environmental Engineering)
- 20Liu, Yang (Civil and Environmental Engineering)
- 18Bayat, Alireza (Civil and Environmental Engineering)
-
Spring 2014
This thesis documents the research undertaken to develop and assess modeling and monitoring tools to improve the water quality management in the Athabasca River, Alberta. The Upper Athabasca River (UAR) has experienced dissolved oxygen (DO) sags, which may affect the aquatic ecosystem. A water...
-
Fall 2014
Samson Cree Nation partnered with researchers at the University of Alberta to conduct a water resources analysis of their water systems. This thesis describes a community-based research approach used to explore domestic water use in Samson Cree Nation, the variables that effect domestic water use...
-
Spring 2021
Different quantities of information are available at various stages of the development of a mining project. Consequential decisions are made given the data available at the time. Geological uncertainty due to sparse data presents economic risks. The collection of additional information reduces...
-
Fall 2012
The laboratory continuous air dense medium fluidised bed separator was tested on the high ash coal of Genesee Mine and has proven to be an effective method for coal dry cleaning. The results show that we can get a yield of 80% with an ash content of 10%, which is a good achievement from the feed...
-
Dual-Level Resource-Constrained Multi-Project Scheduling Framework for Prefabrication in Construction
DownloadFall 2018
Construction prefabrication projects, where engineered systems or components of large size and heavy weight are fabricated with limited workplace and storage areas, typically are executed in a multi-project environment. So, frequent inter-project resource transfers are not feasible and should be...