Search
Skip to Search Results- 1Acorn, Tyler
- 1Alshehri, Naeem S.
- 1Barreto Maya, Martha Maria
- 1Batty, Matthew
- 1Cabral Pinto, Felipe A
- 1Curley, Mark A
- 6Deutsch, Clayton (Civil and Environmental Engineering)
- 4Joseph, Tim (Mining Engineering)
- 1 Gan, Thian Yew (Department of Civil and Environmental Engineering)
- 1AbouRizk, Simaan (Civil & Environmental Engineering)
- 1AbouRizk, Simaan (Civil and Environmental Engineering)
- 1Askari-Nasab, Hooman (Mining Engineering)
-
Spring 2010
A reliable estimate of the amount of oil or gas in a reservoir is required for development decisions. Uncertainty in reserve estimates affects resource/reserve classification, investment decisions, and development decisions. There is a need to make the best decisions with an appropriate level...
-
Fall 2019
In the past few decades, there have been more extreme climate events occurring worldwide, constituting a growing risk for our societies. For example, Canada has experienced several extreme precipitation events that resulted in billions of dollars of damage, such as the flood events of Calgary and...
-
Fall 2016
This thesis explores the development and preliminary operation of a new test method for roller and roller path arrangements on ultra-class mining shovels. The lack of existing lab-scale test methods discourage significant change, and restrict the development of the roller and roller path to minor...
-
Uncertainty in Probabilistic Open Pit Slope Stability Analyses: Implications for Reliability-Based Designs
DownloadSpring 2024
The presence of uncertainty is acknowledged in various fields of Engineering. Also, there are many sources of uncertainties. In geotechnical engineering, probabilistic slope stability analysis (PSSA) is a tool used to quantify parameter uncertainty. It achieves this by considering any strength...
-
Fall 2011
Villalba Matamoros, Martha Emelly
Analysis of uncertainty in ore reserves impacts investment decisions, mine planning and sampling. Uncertainty is evaluated by geostatistical simulation and is affected by the amount of data and the modeling parameters. Incomplete uncertainty is given because the parameter uncertainty is ignored....
-
Spring 2023
This thesis sets out a workflow to quantify uncertainty of the Arrow Deposit, a tabular, vein type, high-grade, basement-hosted, uranium deposit located on NexGen Energy Limited’s 100%-owned Rook I property in northern Saskatchewan. The uncertainty associated with the volume, grade, and density...
-
Spring 2022
Estimating costs for construction projects is a complex and often uncertain process. Given the inherent uncertainty of estimating and the unique risk profile of each construction project, many owners use cost uncertainty analysis to understand a project’s range of potential costs. Since results...