Search
Skip to Search Results- 4Graduate and Postdoctoral Studies (GPS), Faculty of
- 4Graduate and Postdoctoral Studies (GPS), Faculty of/Theses and Dissertations
- 1Geotechnical and Geoenvironmental Engineering Program
- 1Geotechnical and Geoenvironmental Engineering Program/Other Research Publications (Geotechnical & Geoenvironmental Engineering)
- 1Civil and Environmental Engineering, Department of
- 1Civil and Environmental Engineering, Department of/Research Materials (Civil & Environmental Engineering)
- 1Bareither, Christopher (Civil and Environmental Engineering)
- 1Beier, Nicholas (Civil and Environmental Engineering)
- 1Beier,Nicholas
- 1Lefsrud, Lianne (Chemical and Materials Engineering)
- 1Macciotta, Renato (Civil and Environmental Engineering)
- 1McKenna, Gord (Civil and Environmental Engineering)
-
Spring 2019
This thesis aims to demonstrate the feasibility of using System Dynamics (SD) techniques to develop a transparent, open-source and reproducible model capable of simulating long-term soil water dynamics in a tailings-cap system subject to upward flux from a consolidating tailings substrate. The...
-
Spring 2010
The UNderstanding Severe Thunderstorms and Alberta Boundary Layer Experiment (UNSTABLE) in July 2008 was a field project to investigate the initiation of thunderstorms in southern Alberta. Special field observations included an enhanced surface network augmented with instrumented vehicles. ...
-
Possible thunderstorm modifications caused by the Athabasca oil sands development and the Canadian Shield
DownloadFall 2017
Thunderstorms are common in boreal forest regions and can cause dangerous hazards such as lightning, forest fires, hail, wind, and flooding. Significant research has been conducted to help predict thunderstorms to mitigate or avoid the hazards and damage. The development of thunderstorms...
-
Risk Management for Tailings Dam Safety: Considerations for Long-term and Post-closure Timelines
DownloadFall 2022
Post-closure tailings dams are expected to remain on mine sites in perpetuity following mine closure. Combined with the lack of knowledge regarding how tailings dams will evolve over time, these long-time frames necessitate the development of risk management practices. The purpose of this...
-
TMSim_Consol
2021-06-04
Implemented in GoldSim, TMSim_Consol uses an explicit finite difference method to calculate the void ratio at each time step. Excess pore pressure and effective stress in each layer are then derived from void ratio. In addition to the specific gravity (Gs) and geometric properties of the deposit,...