Search
Skip to Search Results- 102Smreciu, A.
- 101Gould, K.
- 101Wood, S.
- 10Syncrude Canada Ltd.
- 9Oil Sands Research and Information Network
- 8Davison, D. S.
- 554Oil Sands Research and Information Network (OSRIN)
- 210Oil Sands Research and Information Network (OSRIN)/AOSERP Reports
- 100Oil Sands Research and Information Network (OSRIN)/Revegetation Species Profiles
- 82Oil Sands Research and Information Network (OSRIN)/Government of Alberta Reports
- 61Oil Sands Research and Information Network (OSRIN)/Syncrude Canada Ltd. Reports
- 60Oil Sands Research and Information Network (OSRIN)/OSRIN Technical Reports
-
1976
A monitoring study of ungulates and furbearing mammals was initiated for Syncrude Canada Ltd. in the vicinity of Syncrude Lease No. 17 during the period between October 15, 1975, and April 30, 1976. The relative abundance and spatial distribution of moose, deer, and 13 species of furbearers were...
-
Preliminary compatibility studies of G.C.O.S. sand tailings pond water with Athabasca River
Download1968
Alberta Health, Environmental Health Services Division
On May 30, 1968 G.C.O.S requested permission to discharge 110 x 106 ft3 of effluent from the sands tailings pond at the Fort McMurray site into the Athabasca River during periods of high river flow. G.C.O.S. outlined the events which made this request necessary in order that an adequate base be...
-
1981
Sneddon, D. T., Van De Maat, D.
This list of papers and articles from professional and learned journals was assembled to provide a point of departure for hydrogeological and geomechanical studies in the Cold Lake Oil Sands. While the list is fairly extensive, it makes no pretext of being exhaustive; although a substantial...
-
Preliminary recommendations for mapping of aquatic habitat parameters for the AOSERP study area
Download1978
Brown, A., Robarts, R. D., Kent, M. J., Park, J. O.
Three aspects of aquatic habitat assessment and mapping have been considered. The first aspect was the review of the parameters which characterize aquatic habitats in the AOSERP study area. From an extensive list, ten parameters for each of lake habitats and river habitats were selected as being...
-
2013-10-03
The main goal of this research project was to take the first steps towards development of an integrated hydrologic and water quality model to support oil sands mine reclamation efforts in Alberta. The model utilized in this study is a modified version of the Soil and Water Assessment Tool...
-
2013-10-18
Gould, K., Wood, S., Smreciu, A.
Species profile for Primula pauciflora var. pauciflora: saline shooting star, darkthroat shooting star
-
1977
Promet Environmental Group Ltd. was retained to perform an analysis of the meteorological data available from the Tar Sands area. The probabilities of occurrence of various meteorological parameters will be used as a basis for estimating the frequencies of occurrence and costs associated with...
-
1986
Syncrude Canada Limited’s Fort McMurray oi1 sands mining operations has been operating under the concept of zero discharge and total containment of wastewaters since start up in 1978. During this period a considerable volume of contaminated water has been assimulated in a large on-site tailings...
-
1976
Fedkenheuer, A. W., Brown, S. J.
The extraction of bitumen from the Athabasca Oil Sands can be considered successful only if workable and economically feasible methods of reclamation of the area following mining are developed. This is the purpose of the Alberta Oil Sands Environmental Research Program's Vegetation Technical...
-
1980
Regier, H., Ziemkiewicz, P. F., Takyi, S. K.
Over the past ten years, soil reconstruction in the reclamation of agricultural lands has received increasing attention, particularly in the Plains Coal Region of Canada and the United States. Despite this considerable level of research activity, some time remains before we will know how to...