Theses and Dissertations
This collection contains theses and dissertations of graduate students of the University of Alberta. The collection contains a very large number of theses electronically available that were granted from 1947 to 2009, 90% of theses granted from 2009-2014, and 100% of theses granted from April 2014 to the present (as long as the theses are not under temporary embargo by agreement with the Faculty of Graduate and Postdoctoral Studies). IMPORTANT NOTE: To conduct a comprehensive search of all UofA theses granted and in University of Alberta Libraries collections, search the library catalogue at www.library.ualberta.ca - you may search by Author, Title, Keyword, or search by Department.
To retrieve all theses and dissertations associated with a specific department from the library catalogue, choose 'Advanced' and keyword search "university of alberta dept of english" OR "university of alberta department of english" (for example). Past graduates who wish to have their thesis or dissertation added to this collection can contact us at erahelp@ualberta.ca.
Items in this Collection
- 1AL-Alawi, Mubarak K
- 1Ajweh,Ziad
- 1Al-Hussein, Riphay
- 1Alanjari, Pejman
- 1Altaf, Mohammed Sadiq
- 1Alvanchi, Amin
- 5AbouRizk, Simaan (Civil and Environmental Engineering)
- 5Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 3Mohamed, Yasser (Civil and Environmental Engineering)
- 2AbouRizk, Simaan (Department of Civil and Environmental Engineering)
- 2Deutsch, Clayton (Civil and Environmental Engineering)
- 1AL-Hussein, Mohamed (Civil & Environmental Engineering)
-
Fall 2014
Connected Vehicle (CV) technology is a promising advancement that has the potential to improve traffic safety and traffic efficiency, and support other Intelligent Transportation Systems (ITS) applications through facilitating vehicle-to-vehicle and vehicle-to-infrastructure communication. Since...
-
A Framework for Design of Panelized Wood Framing Prefabrication Utilizing Multi-panels and Crew Balancing
DownloadSpring 2014
The construction industry is highly competitive and continually striving towards improving its performance in terms of time, cost, quality, and safety. Improved performance is essential to survival in today’s construction market. In this regard, measuring productivity can facilitate improved...
-
Fall 2014
This research focuses on the accounts payable function in construction firms. The cash conversion cycle includes accounts payable and accounts receivable support functions. Research objectives focus on mapping the existing accounts payable processes in construction, building a model to represent...
-
Fall 2013
Construction project costs are exchanged in the form of large numbers of purchase orders, which translates into many thousands of invoices. In typical contractual relationships, these invoices are exchanged between all parties involved in a construction project, including owners, engineers,...
-
Spring 2015
Although much academic research has been performed in the study of construction process simulation, this research has not seen mainstream application in the construction industry. Many factors play a deterrent role in the adoption of simulation by construction end users, mainly the time, cost and...
-
Advanced quantitative techniques to enhance heavy and civil construction information modeling
DownloadSpring 2011
Site development in heavy and civil construction need to consider many rules such as ensuring proper drainage, prevention of flood, safety driving, optimizing earthwork, minimizing fleet travel distances, proper fleet matching and achieving high equipment utilization rates. In recent decades,...
-
Fall 2010
Simulation is often used to model production processes with the aim of understanding and improving them. In many cases, however, information produced by simulation is not detailed enough and can be misinterpreted. The use of visualization in combination with simulation can provide project...
-
Fall 2009
Geostatistical techniques are used to estimate recoverable reserves at unsampled locations and to quantify uncertainty. Several variables are often measured and important for reserve evaluation. Using more variables improves the quality of modeling, but quantifying the relationships between the...
-
Fall 2016
Site layout planning, which involves identifying sizes and locations of temporary facilities, can have significant impacts on the safety, cost, time, and productivity of projects. Despite considerable research undertaken to improve efficiency of planning construction site layouts, most models...
-
Fall 2010
The allocation of resources over time, referred to as resource scheduling, in large-scale construction environments is a challenging problem. Although traditional network scheduling techniques are the most popular scheduling techniques in the construction industry, they are ineffective in...