Presentations (Civil & Environmental Engineering)
Items in this Collection
- 24Civil and Environmental Engineering, Department of
- 24Civil and Environmental Engineering, Department of/Presentations (Civil & Environmental Engineering)
- 5Geotechnical and Geoenvironmental Engineering Program
- 3Geotechnical and Geoenvironmental Engineering Program/Other Research Publications (Geotechnical & Geoenvironmental Engineering)
- 2Geotechnical and Geoenvironmental Engineering Program/Conference Proceedings (Geotechnical & Geoenvironmental Engineering)
-
2019-11-20
Li, R., El-Basyouny, K., Kim, A.
This study examined the safety effects of the City of Edmonton’s mobile enforcement program. Four years of city-wide monthly collision data, enforcement statistics, and employment rate data was incorporated in a generalized linear Poisson model. It was found that the estimations of the...
-
2019-11-20
Airport leakage is a phenomenon that occurs when air passengers choose to travel longer surface distances to take advantage of better air services at an out-of-region airport (which we term the “substitute” airport), instead of using their local airport as would be expected (Suzuki & Audino,...
-
2018-01-01
Tiruneh, Getaneh Gezahegne, Fayek, Aminah Robinson
The variables that characterize construction organizational competencies are both quantitative and qualitative in nature, and thus require measurement methods and modeling techniques that can handle both variable types. Models that are capable of relating organizational competencies to...
-
2022-01-01
Nguyen, Phuong, Fayek, Aminah Robinson, Hamzeh, Farook
Measurement of construction labor productivity involves various subjective factors (e.g., motivation, stress, and fatigue). Most measurement approaches for subjective factors in productivity applications require manual data collection (e.g., questionnaires, interviews, and observations);...
-
2019-11-18
The Airspace Flow Program (AFP) ground delays flights in order to control their flow through capacity constrained airspace regions. It has been successful in controlling traffic with reasonable delays, but the procedures must be improved upon to handle future projected demands. This paper...
-
Consensus building and optimization in group decision-making for the risk assessment of Wind Farm Project
Download2020-01-01
Hao, Yajie, Kedir, Nebiyu Siraj, Seresht, Nima Gerami, Pedrycz, Witold, Fayek, Aminah Robinson
Infrastructure projects for harnessing renewable energy (e.g., wind farm projects) have recently gained popularity because of their low adverse impact on the environment. However, it is challenging to perform risk assessments for these projects because data are either scarce or of low quality....
-
Determining Project Contingency Reserve Using a Fuzzy Arithmetic-Based Risk Analysis Method
Download2020-01-01
Fateminia, Seyed Hamed, Siraj, Nasir Bedewi, Fayek, Aminah Robinson, Johnston, Andrew
Traditional techniques for estimating contingency reserve fail to capture subjective uncertainties and expert knowledge, and they rely on historical data. This paper proposes a fuzzy risk analysis model (FRAM) that uses fuzzy arithmetic to analyze risk and opportunity events and determine...