Integer-Programming-Assisted Path-Float-Based Method for Time-Cost Tradeoff Optimization in Project Planning
DownloadFall 2019
In theory, time-cost tradeoff (TCT) optimization is a classic planning problem appealing to construction management; yet, existing analytical methods are found inadequate to make a significant impact in practice. Heuristic methods lack a theoretical basis to ensure arriving at optimum solutions...