This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results-
Spring 2014
With the trend of global urbanization, underground space is being more and more exploited. To fulfill the need of sustainable development of underground space, it is necessary to well document the as-built positions of the facilities we have built. In the current practice, the as-built models are...
-
Evaluation of Methods Used to Estimate the Required Thrust Force for Direct Pipe Installation Within Clayey Soil Based on Case Studies
DownloadSpring 2019
There is a unique technology called Direct Pipe Installation (DPI) developed by Herrenknecht Tunnelling Systems (Herrenknecht) which is becoming more a prominent construction method in the pipeline crossing industry. This construction technique is completed by connecting a micro tunnel boring...
-
Using under-road tunnels to protect a declining population of long-toed salamanders (Ambystoma macrodactylum) in Waterton Lakes National Park
DownloadFall 2010
I investigated the value of under-road tunnels as a conservation strategy to protect a long-toed salamander population, in south-west Alberta, whose overwintering sites and breeding habitat (Linnet Lake) are separated by a road. I conducted a mark-recapture study from 2008-2009, capturing...