Evaluation of Methods Used to Estimate the Required Thrust Force for Direct Pipe Installation Within Clayey Soil Based on Case Studies

  • Author / Creator
    Goerz, Stefan J.B.
  • There is a unique technology called Direct Pipe Installation (DPI) developed by Herrenknecht Tunnelling Systems (Herrenknecht) which is becoming more a prominent construction method in the pipeline crossing industry. This construction technique is completed by connecting a micro tunnel boring machine (MTBM) to a section of welded pipeline and utilizing a thruster on surface to push the pipeline through the ground while excavation of the soil by the MTBM commences. Evaluation of the total thrust force required to advance the MTBM during DPI construction in clayey soil is the focus of this research.The current state of practice calculation method was developed by Herrenknecht (Pruiksma, Pfeff, & Kruse, 2012), utilizing concepts from both horizontal directional drilling (HDD) and conventional micro-tunnelling theories. Following extensive review of the calculation method, the most sensitive parameters were determined. Among the most sensitive were the soil to pipeline interface friction, the roller to pipeline interface friction, the coefficient of horizontal earth pressure, and the applied pressure above minimal pressure. Using the data obtained from four DPI construction projects, and geotechnical information from the site characterization documents, total realized thrust was compared to the current state of practice calculation. The calculation over predicted the realized thrust in three case studies (maximum average percent error of 319%), and under predicted in a single case study (minimum average percent error of 9%) while tunnelling in cohesive soil conditions. Current calculation methods show that friction generation is the main contribution to the total thrust force; however, findings from this research show that the soil reaction at the cutting face is underestimated, and the frictional component may be severely over estimated. Using linear regression analysis for specific sections of the DPI tunnel alignment, the pipeline roller interface, lubrication and pipeline to soil interface friction values were estimated. As well, the realized front cutting face force determined from the analysis was larger than the predicted value at the same location along the tunnel alignment. As suggested in this research, after decreasing the frictional resistance and increasing the front cutting face force in cohesive soil, it is expected that the total thrust calculation will more closely predict the realized thrust force on future DPI projects.

  • Subjects / Keywords
  • Graduation date
    Spring 2019
  • Type of Item
    Thesis
  • Degree
    Master of Science
  • DOI
    https://doi.org/10.7939/r3-p51b-fw89
  • License
    Permission is hereby granted to the University of Alberta Libraries to reproduce single copies of this thesis and to lend or sell such copies for private, scholarly or scientific research purposes only. Where the thesis is converted to, or otherwise made available in digital form, the University of Alberta will advise potential users of the thesis of these terms. The author reserves all other publication and other rights in association with the copyright in the thesis and, except as herein before provided, neither the thesis nor any substantial portion thereof may be printed or otherwise reproduced in any material form whatsoever without the author's prior written permission.