This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 21Oil Sands Research and Information Network (OSRIN)
- 8Oil Sands Research and Information Network (OSRIN)/Government of Alberta Reports
- 8Oil Sands Research and Information Network (OSRIN)/AOSERP Reports
- 3Oil Sands Research and Information Network (OSRIN)/Syncrude Canada Ltd. Reports
- 1Oil Sands Research and Information Network (OSRIN)/OSRIN Technical Reports
- 1Oil Sands Research and Information Network (OSRIN)/Other Technical Reports (OSRIN)
- 2Evans, B. J.
- 2Neill, C. R.
- 2Syncrude Canada Ltd.
- 1A.A. Aquatic Research Ltd.
- 1Alam, Shahabul
- 1Alberta Environment, Hydrology Branch
-
1977-01-01
Loeppky, K. D., Spitzer, M. O.
This report contains hydrometric data for the Alberta Oil Sands Environmental Research Program (AOSERP) study area to December, 1976. All available daily discharge data are contained within Appendices of this report. The report also contains annual hydrographs of discharge data, water level...
-
Numerical Modelling of the Impact of Cover Thickness on the Long-term Water Balance of Reclamation Soil Covers Over Lean Oil Sands Overburden
Download2017-03-25
Huang, Mingbin, Alam, Shahabul, Barbour, Lee, Si, Bing Cheng
Syncrude Canada Ltd. (SCL) is undertaking a watershed scale research program to evaluate the performance of reclamation covers placed over lean oil sands (LOS) at the Fort Hills dump at the Aurora North mine site. This research study is referred to as the Aurora Capping Study (ACS). A key element...
-
2013-10-03
The main goal of this research project was to take the first steps towards development of an integrated hydrologic and water quality model to support oil sands mine reclamation efforts in Alberta. The model utilized in this study is a modified version of the Soil and Water Assessment Tool...
-
Present and potential effects of anthropogenic activities on waters associated with peatlands in Alberta
Download1990
A literature review and problem analysis of the present and potential effects of human activities in peatlands on the quality and quantity of associated waters is presented in this report. The specific objectives were to describe: 1. The present state of knowledge about waters associated with...
-
1993
Alberta Environmental Protection, Technical Services and Monitoring Division
This study was undertaken for the Technical Committee, Canada-Alberta Flood Damage Reduction Program in response to concerns raised by the City of Fort McMurray over the validity of the elevation established in previous studies as representing the 1 in 100 year design flood level. The specific...
-
1975-01-01
In December, 1973, the Environmental Planning Division of the Department of the Environment invited proposals for preliminary studies associated with a proposed dam on the Athabasca River in the vicinity of Crooked Rapids. This study was carried out in co-operation with the Energy Resources...
-
1979
The drainage system of the study area consists of a number of rivers draining from the west and from the east into the Athabasca River north of Fort McMurray, as well as a few rivers which join the Athabasca near Fort McMurray and drain areas to the south and east. Runoff from within the study...