Search
Skip to Search Results-
Fall 2015
The objective of this thesis is to develop, implement and verify a theoretical framework based upon aggregation and mathematical programming for solving the long-term open pit production planning problem. The goal is to closely estimate the maximum net present value of the operation by providing...
-
Fall 2011
An industrial construction enterprise operating in the City of Edmonton wants to improve its bidding strategies that are currently plagued with uncertainty, lack of information and historical price variability. The present research studies a compilation of documents obtained from company archives...
-
Extracting and Integrating Industrial Construction Steel Trade Data in ill-formed BIM Models
DownloadFall 2017
Oil and gas are known for their huge-size and complex projects that consist of multiple trades’ subprojects such as concrete, steel, and piping. These subprojects are executed within a confined area during a limited time frame. This requires careful planning and coordination between these...
-
Spring 2018
This thesis addresses challenges in geostatistical analyses of multivariate geochemical data that commonly contain complexities that have a significant influence on geostatistical modeling and cluster analysis. For geostatistical modeling, the effect of the most common despiking methods is...