Search
Skip to Search Results- 3Sand Retention Testing
- 2Sand Control
- 1Fines Migration
- 1Full-scale Completion Testing Facility
- 1Oil Sands
- 1Plugging
- 1Abou-Kassem, Abdulla Jamal
- 1Alireza Nouri
- 1Chenxi Wang
- 1Dadjou, Hoda
- 1Mahmoud Salimi
- 1Mohammad Haftani
-
A Novel Sand Control Testing Facility to Evaluate the Impact of Radial Flow Regime on Screen Performance and its Verification
Download2020-05-11
Mohammad Haftani, Omar Kotb, Phuong H. Nguyen, Chenxi Wang, Mahmoud Salimi, Alireza Nouri
Optimum design of the sand control devices in oil sand reservoirs plays a vital role in minimizing the sand production and increasing the reservoir productivity in Steam-Assisted Gravity Drainage (SAGD) operations. Various sand control testing facilities have been developed to evaluate the...
-
Near-Wellbore Salinity Effect on Sand Control Plugging by Fines Migration in Steam-Assisted Gravity Drainage Producer Wells
DownloadFall 2023
Sand control screens are necessary for steam-assisted gravity drainage (SAGD) wells drilled into oil sands to prevent sand production. However, the accumulation of mobilized fine particles near the wellbore can result in screen plugging, adversely affecting the well's flow performance. This...
-
Workflow for Sand Control Testing of Injection Wells in Steam Assisted Gravity Drainage (SAGD)
DownloadSpring 2020
This research aims at tackling a specific production engineering problem in sand retention testing (SRT). One common practice of operational oil companies is to prevent sanding by deploying standalone screens (SAS). SAS consists of slotted liners (SL), wire wrap screens (WWS), and punched screens...