Enhancements to Methods for Planning and Scheduling Fabrication Projects Utilizing Multiskilled Labour Resources
DownloadSpring 2023
In prefabrication and off-site construction, various multiskilled work crews need to be assembled to work on different workstations to process custom-designed work units, each having specific requirements for material handling, assembly connections, welding, etc. However, the frequent labour...
-
Fall 2013
Scaffolds are temporary structures that are built to support workers and materials and facilitate direct work on construction sites. A considerable amount of man power resources are consumed by industrial construction scaffolding, which makes effective planning and estimation of the same very...
-
Fall 2012
The earthwork operations for reclamation add challenges and complications to common earthworks schedule and aspects such as placement locations and hauling routes…etc. The reclamation earthworks require that the soil layers structure before disturbing the land must remain the same after...