This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 2Operations research
- 1Fuzzy set theory
- 1Industrial construction
- 1Integrated modeling
- 1Mine planning
- 1Multi-criteria scheduling
-
An Integrated Optimization Model for Strategic Open-Pit Mine Planning and Tailings Management
DownloadFall 2014
Badiozamani Tari Nazari, Mohammad Mahdi
A strategic mine planning model determines the best order of extraction and destination of material over the mine-life, in a way that maximizes the net present value of the produced minerals. In case of oil sands open-pit mining, further processing of the extracted oil sands generates massive...
-
Spring 2010
The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than...