Search
Skip to Search Results- 12Uncertainty
- 7Geostatistics
- 3Mining
- 2Conditional Simulation
- 1Automatic experimental variogram calculation
- 1Automatic variogram modeling
- 1Alshehri, Naeem S.
- 1Batty, Matthew
- 1Cabral Pinto, Felipe A
- 1Haring, Veronica
- 1Hong, Sahyun
- 1Karpekov, Tolonbek
- 4Deutsch, Clayton (Civil and Environmental Engineering)
- 1AbouRizk, Simaan (Civil & Environmental Engineering)
- 1AbouRizk, Simaan (Civil and Environmental Engineering)
- 1Askari-Nasab,Hooman (School of Mining and Petroleum Engineering)
- 1Boisvert, Jeff (Mine Engineering)
- 1Cunha, Jose Carlos (Petrobras America Inc.)
-
Fall 2011
Villalba Matamoros, Martha Emelly
Analysis of uncertainty in ore reserves impacts investment decisions, mine planning and sampling. Uncertainty is evaluated by geostatistical simulation and is affected by the amount of data and the modeling parameters. Incomplete uncertainty is given because the parameter uncertainty is ignored....
-
Spring 2023
This thesis sets out a workflow to quantify uncertainty of the Arrow Deposit, a tabular, vein type, high-grade, basement-hosted, uranium deposit located on NexGen Energy Limited’s 100%-owned Rook I property in northern Saskatchewan. The uncertainty associated with the volume, grade, and density...
-
Spring 2022
Estimating costs for construction projects is a complex and often uncertain process. Given the inherent uncertainty of estimating and the unique risk profile of each construction project, many owners use cost uncertainty analysis to understand a project’s range of potential costs. Since results...