Search
Skip to Search Results- 2Barkokebas, Beda
- 1Abdollahnejad, Sina
- 1Ali, Mostafa A A
- 1Alwisy, Aladdin
- 1Azhin, Maryam
- 1Barczyk, Martin
- 3Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 3Deutsch, Clayton (Civil and Environmental Engineering)
- 2Jing, Yindi (Electrical and Computer Engineering)
- 2Mohamed, Yasser (Civil and Environmental Engineering)
- 2Stevan Dubljevic (Department of Chemical and Materials Engineering)
- 1Abourizk, Simaan (Civil and Environmental)
-
Spring 2016
Improving the accuracy of estimates is of great importance in the mining industry. These estimates can be improved with the use of available secondary data. This includes any less trusted data source containing bias and error such as production sampling, legacy drill holes, or cheaper lower...
-
Streamlining Decarbonized Construction through Automated Design and Drafting: Ribbed Precast Concrete Panels
DownloadFall 2023
The use of precast concrete panels in panelized construction has gained popularity due to their numerous advantages. However, conventional precast designs encounter challenges, such as high costs, limited flexibility, and restrictions in remodelling. To address these issues, this research...
-
Fall 2014
Multi-input-multi-output (MIMO) system, due to its large channel capacity and high reliability, has been widely studied in numerous existing work. It has a lot of applications in reality, e.g., 3GPP and LTE standards. These advantages owes to the understanding of the MIMO channel, which shows the...