Search
Skip to Search Results-
An ecophysiological investigation of the jackpine woodland with reference to revegetation of mined sands
Download1980
This project was conceived as a multidisciplinary integrated study to determine the physiological limits of native and non-native species to dry, nutrient-poor environmental conditions on a steep-sided sand dike and on sand piles. Only when the limits of survival are known for native and...
-
1980
Gale, C. A., Maclean, A. H., Turchenek, L. W., McGill, W. B.
Monitoring was continued at instrumented sites which were selected in spring 1976, at Mildred Lake, Supertest Hill, the GCOS dike, and near Richardson Tower. Because of budget limitations, sites at Richardson were only monitored occasionally. However, information was obtained at a number of...
-
Interim report on reclamation for afforestation by suitable native and introduced tree and shrub species
Download1979
Dunsworth, B. G., Takyi, S. K., Sherstabetoff, J. N.
AOSERP project VE 7.1 was initiated to carry out field investigations in the revegetation of oi1 sands mine wastes (waste dumps and tailing sand) with trees and shrubs. The main objective of the project is to select species of trees and shrubs which are adapted to conditions on these waste...
-
Interim report on small mammal populations and related tree damage in the AOSERP study area, October and November 1977
Download1977
The afforestation program in the Athabasca Oil Sands area has been only moderately successful, because of the high mortality of the planted seedlings--much of which Is believed to be the result of high levels of small mammal damage. The objectives of the present study were: (1) to determine the...