Search
Skip to Search Results
Filter
Subject / Keyword
- 1CCTV
- 1Inspection
- 1Productivity Factor
- 1Productivity Improvement
- 1Productivity Study
- 1Rout Optimization
Author / Creator / Contributor
Year
Collections
Languages
Item type
-
Spring 2014
This thesis focuses on conducting productivity analysis for sewer mainline CCTV inspection through two phases: 1) developing the standard time for CCTV inspection and analyzing the effect of the weather condition and ambient temperature on its productivity, and 2) reviewing the CCTV process...
1 - 1 of 1