Search

Skip to Search Results
  • 1973

    Intercontinental Engineering of Alberta Ltd.

    A collection of working papers that helped inform the final report and recommendations, including: • Recommended Models for Calculating Diffusion From Point Sources With Applications to the Athabasca Bituminous Sands Area Western Research & Development Ltd • Meteorological Aspects of the Athabasca

    Tar Sands Study Geoscience Research Associates Limited • Research on Waste Disposal and Waste Deposits Research Council of Alberta • Utilities Technology and Energy Aspects Intercontinental Engineering Ltd. • Athabasca Tar Sands Baseline Study British Columbia Research • The Environmental Impact of In

  • 2010-08-11

    BGC Engineering Inc.

    BGC Engineering Inc. (BGC) conducted a review of existing tailings technologies for the Oil Sands Research and Information Network (OSRIN). Over the years, many technologies have been proposed and field tested but they have been rejected for lack of technical or economic feasibility. With no

    unique and acceptable solution yet in sight, research is now focusing on schemes which utilize more than one technology and combining them into a disposal package. This report presents an in-depth review of the state-of-knowledge related to oil sands fine tailings treatment technologies. All information

    is from publicly available sources at the time of writing. The aim of this report is to serve as a fundamental planning document for future research initiatives by OSRIN and other research agencies to support, promote, and improve the oil sands industry’s capability to deal with the challenges of

  • 1982

    Lindsay, J. D., Turchenek, L. W.

    , agriculture, engineering, wildlife and recreational uses, and soil sensitivity to acidic deposition. Data for representative soil profiles are presented in RMD Report L-80, \"Soils Inventory of the Alberta Oil Sands Environmental Research Study Area: Appendix 9.4\".

    A soil survey of the Alberta Oil Sands Environmental Research Program (AOSERP) study area was initiated in 1976 as part of the program objective to establish a data base for the area. The purpose of this report and accompanying soil maps is to provide data on the kinds, characteristics, location

    means of air photo interpretation and supporting field checks on 1:50,000 airphotos. Recurring patterns of soils, landforms, and vegetation were delineated. The information was transferred first to 1:50,000 preliminary maps and then to eight 1:126,720 maps which accompany this report. General

  • 1974

    Athabasca Tar Sands Corridor Study Group

    , highways and railways. The Corridor Concept is applicable. \"Alberta Skaro Terminal\" is the provisional name used in this report for the major provincial terminal. The purpose of this terminal is to receive, measure, pass-through, transfer, or direct liquid hydrocarbons by pipeline, railway or truck

    Development Plan covered: the social and physical environment, engineering and economic considerations, hydrocarbon supply and demand, decentralization of urban growth, continued support of existing facilities, export of surplus products and the location constraints of each facility. Those participating in

    the \"Corridor Concept\" part of the plan involved the public, citizens' groups, industry and the multi-discipline consultant group. After this participation and additional study the consultant group prepared the plan contained in this report. Optimistic projections were made to ensure flexibility in

  • 2010-08-10

    BGC Engineering Inc.

    BGC Engineering Inc. (BGC) conducted a scoping study of the state of knowledge related to technologies for reclaiming oil sands tailings substrates to upland boreal forests and wetlands for the Oil Sands Research and Information Network (OSRIN). The objective of the scoping study is to help

    establish an understanding of the status of fine tailings reclamation technology in the Athabasca Oil Sands Region (AOSR). Relevant research was compiled from peer reviewed and non-peer reviewed sources including journals, conference proceedings, magazine articles, internal and consultant reports

  • 2010-11-30

    Welham, C.

    young reclamation plantations at the Kearl Lake mine. The report begins with an introductory chapter that defines core concepts and project objectives. Dendrochronology The dendrochronology work examined the relationship between climate and tree growth (specifically ring width) for four species (white

    may better explain ring chronologies. The full report is provided in Section 2. Habitat suitability analysis Habitat suitability indices (HSIs) were calculated from equations for 10 boreal forest wildlife species (moose, black bear, snowshoe hare, lynx, red-backed vole, fisher, Cape May warbler

    degree of biodiversity on the reclaimed landscape. 6. When habitat recovery rates on reclaimed sites are considered in conjunction with the overall mine footprint, it suggests that the negative impact of the operation is not trivial with respect to habitat loss. The full report is contained in Section 3

1 - 6 of 6