A Framework for Forecasting Project Estimate at Completion Using Historical and Current Performance Data
DownloadFall 2018
Earned value management (EVM) is an integrated project control method that incorporates project scope, budget, and schedule. EVM uses various metrics to report project cost or schedule performance, such as the cost performance index (CPI) and schedule performance index (SPI). In addition to...
-
Spring 2012
Engineering work can account for 10% to 20% of capital project costs, and up to 50% of a project’s schedule. The construction industry rigorously implements control techniques to minimize cost and schedule overruns; however, the same cannot be said for controlling engineering work. Over the...