This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 2Construction automation
- 11 dimensional optimization
- 1Automated modular construction machines
- 1Building Information Modeling
- 1Frame assemblies
- 1Light gauge steel framing
-
A design support system to determine the machine eligibility for manufacturing frame assemblies
DownloadFall 2019
As offsite construction is trending, an increasing number of construction products are fabricated in a controlled factory environment. By using automated machinery, the productivity and accuracy of construction-oriented products have been improved. However, as BIM models do not provide...
-
An intelligent framework for computer-aided automation and optimization of Light-Frame Building manufacturing process
DownloadSpring 2019
The growth of panelized construction in North America’s building construction sector has allowed for the emergence of a viable alternative to traditional construction methods. Panelized construction has proven to be a promising method due to its use of off-site manufacturing technology, which...