This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search ResultsResults for "Structural Engineering Reports"
-
1975-01-01
Conservation Board and under the direction of B.C. Doell study co-ordinator. In March, 1974, the study was awarded to Thurber Consultants Ltd. who had submitted a joint proposal with Crippen Engineering Ltd. and Northwest Hydraulic Consultants Ltd. The Consultants' report was submitted in two volumes in
early February, 1975. This is a summary of the Consultant’s findings. It should be noted, however, that owing to the complicated conditions at Crooked Rapids, a summary of reasonable length cannot cover all aspects of the situation. Consequently, Volume 1 of the Consultant’s report must also be read
before a full appreciation of the various problems can be obtained. The Consultants were requested to carry out preliminary studies to determine the technical feasibility and estimated cost of constructing a dam in the vicinity of Crooked Rapids. The study was to encompass all engineering considerations