Search
Skip to Search Results- 478Oil Sands Research and Information Network (OSRIN)
- 220Oil Sands Research and Information Network (OSRIN)/AOSERP Reports
- 97Graduate and Postdoctoral Studies (GPS), Faculty of
- 97Graduate and Postdoctoral Studies (GPS), Faculty of/Theses and Dissertations
- 84Oil Sands Research and Information Network (OSRIN)/Government of Alberta Reports
- 72Oil Sands Research and Information Network (OSRIN)/OSRIN Technical Reports
- 481Report
- 97Thesis
- 9Article (Published)
- 7Research Material
- 3Conference/Workshop Poster
- 1Conference/Workshop Presentation
-
1973
Tottrup Engineering Limited, F.F. Slaney & Company Limited, Kates, Peat, Marwick & Company
This study reviews constraints that should be considered in connection with synthetic crude pipe line gathering systems and routes within the Athabasca tar sands area. Specifically the terms of reference of this study were defined as: a) Study and identify all the important constraints in...
-
1973
It is the purpose of this report to examine existing legislation to determine (1) what machinery is available for the creation of a transportation corridor, (2) what problems accrue or could accrue by virtue of that legislation. Examination of this area raises several questions: (1) what is the...
-
1973
Stewart Weir Stewart Watson & Heinrichs
Contains the following chapters: Existing Facilities Location of Transportation Facilities Pipeline and Powerline Impact Rural Agricultural Area The Environmental Impact Analysis Corridor Cross-Section Cost Analysis Inter-Party Responsibilities in Utility Corridor
-
Some chemical and physical properties of soil materials associated with the reclamation of mined tar sands areas
Download1972
This document consists of two tables providing chemical and physical properties of soil, peat, overburden, spent sand and lean tar sand from Syncrude and Suncor.
-
1972
Conservation and Utilization Committee
The basic premise is that the demand for synthetic crude oil is from markets external to Canada, consequently one primary objective and five secondary objectives are suggested: 1. Alberta should regulate and control the Athabasca tar sands development for the socio-economic benefit of Albertans....
-
Athabasca tar sands study: Interim report on environmental constraints and research priorities for mining/hot water extraction technology
Download1972
Recommendations: 1. Determine the location and capacity of natural drainage basins (if any) within the mineable area which could be dedicated to the storage of tailings without detriment to the environment. 2. In future the storage of tailings in dyked ponds on the banks of the Athabasca River...
-
1970
Alberta Health, Environmental Health Services Division
Five sampling surveys were conducted on the waters of the Athabasca River and its tributaries during the winter of 1969 - 1970. Samples were taken to analyze the river waters for chemical composition and bacteriological constituents on a regular basis. Loadings of Biochemical Oxygen Demanding...
-
1969
Alberta Health, Environmental Health Services Division
The Athabasca River serves as a source of water supply and a receiving stream for the wastes of two major industries and several communities. This report presents the summary of water quality in the Athabasca River during six sampling surveys (including a site at Fort McMurray, Tar Island, above...
-
Preliminary compatibility studies of G.C.O.S. sand tailings pond water with Athabasca River
Download1968
Alberta Health, Environmental Health Services Division
On May 30, 1968 G.C.O.S requested permission to discharge 110 x 106 ft3 of effluent from the sands tailings pond at the Fort McMurray site into the Athabasca River during periods of high river flow. G.C.O.S. outlined the events which made this request necessary in order that an adequate base be...