Search
Skip to Search Results- 4Syncrude Canada Ltd.
- 2Intercontinental Engineering of Alberta Ltd.
- 2Stewart Weir Stewart Watson & Heinrichs
- 1Alberta Environment
- 1Alberta Environment, Standards and Approvals Division
- 1Bolter Parish Trimble Ltd.
-
1973
Intercontinental Engineering of Alberta Ltd.
A collection of working papers that helped inform the final report and recommendations, including: • Recommended Models for Calculating Diffusion From Point Sources With Applications to the Athabasca Bituminous Sands Area Western Research & Development Ltd • Meteorological Aspects of the...
-
An environmental study of the Athabasca tar sands: Report and recommendations to Alberta Department of the Environment
Download1973
Intercontinental Engineering of Alberta Ltd.
The following was the general concept of the work for which the Study was commissioned: • Identify the various methods that could be used for oil extraction and their comparative merits with respect to minimum adverse effects on the environment. • In considering the Clark method of tar sands...
-
1973
K.C. Mackenzie Associates Ltd.
The general purpose of this report is to examine various constraints, resulting from human settlement patterns, which will affect the selection of a route for the proposed pipeline corridor. In addition to the definition of constraints, the report will also identify factors which, unlike...
-
1973
Tottrup Engineering Limited, F.F. Slaney & Company Limited, Kates, Peat, Marwick & Company
This study reviews constraints that should be considered in connection with synthetic crude pipe line gathering systems and routes within the Athabasca tar sands area. Specifically the terms of reference of this study were defined as: a) Study and identify all the important constraints in...
-
1973
It is the purpose of this report to examine existing legislation to determine (1) what machinery is available for the creation of a transportation corridor, (2) what problems accrue or could accrue by virtue of that legislation. Examination of this area raises several questions: (1) what is the...
-
1973
Stewart Weir Stewart Watson & Heinrichs
Contains the following chapters: Existing Facilities Location of Transportation Facilities Pipeline and Powerline Impact Rural Agricultural Area The Environmental Impact Analysis Corridor Cross-Section Cost Analysis Inter-Party Responsibilities in Utility Corridor