Search
Skip to Search Results- 476Oil Sands Research and Information Network (OSRIN)
- 220Oil Sands Research and Information Network (OSRIN)/AOSERP Reports
- 154University of Alberta Libraries Licensed Resources
- 154University of Alberta Libraries Licensed Resources/Sixth International Conference on Acid Rock Drainage
- 83Oil Sands Research and Information Network (OSRIN)/Government of Alberta Reports
- 73Oil Sands Research and Information Network (OSRIN)/OSRIN Technical Reports
- 475Report
- 160Article (Published)
- 60Thesis
- 8Research Material
- 6Conference/Workshop Presentation
- 5Article (Draft / Submitted)
- 23Department of Chemical and Materials Engineering
- 19Department of Civil and Environmental Engineering
- 6Department of Renewable Resources
- 4Department of Earth and Atmospheric Sciences
- 3Department of Mechanical Engineering
- 1Chemical and Materials Engineering
- 2Gamal El-Din, Mohamed (Civil and Environmental Engineering)
- 2Soares, Joao (Chemical and Materials Engineering)
- 2Ulrich, Ania (Department of Civil and Environmental Engineering)
- 2Zeng, Hongbo (Chemical and Materials Engineering)
- 1Amit Kumar (Mechanical Engineering)
- 1Askari-Nasab, Hooman (Civil and Environmental Engineering)
-
2003
Lottermoser, B. G., Costelloe, M. T., Ashley, P. M.
The Mary Kathleen tailings storage facility (TSF) contains 7.1 Mt of uranium mill tailings. This waste repository was rehabilitated in the mid-1980s using a multibarrier dry cover. At the time of mine closure, it was predicted that acid mine drainage (AMD) generation would not eventuate and that...
-
1973
Conservation and Utilization Committee
The Honourable Mr. Yurko has requested the Conservation and Utilization Committee to establish an interdepartmental task force or project team with additional membership from the Faculty of Agriculture and Forestry and others, if necessary, to define our applied research proposal which the...
-
Tarring the Oil Sands: The Evolution and Emergence of ENGO Opposition in Alberta’s Oil Sands and Social Movement Theory
DownloadFall 2012
ABSTRACT: The Alberta oil sands represent tremendous economic growth and prosperity for Alberta and Canada but their development does not come without cost. Environmental Non-Governmental Organizations (ENGOs), specifically the Pembina Institute and Greenpeace, have brought significant attention...
-
2003
Kuyucak, N., Chávez, J., Rosa del Castillo, J., Ruiz, J.
Environmental Impact Assessment (EIA) and Feasibility Studies (FS) were carried out to evaluate the potential use of treated acid mine drainage (AMD) occurring at the Kingsmill Tunnel in the Central Andes of Peru. The 11 km long tunnel drains the underground works of the Morococha Mining District...
-
Technical Support Document for the Regional Sustainable Development Strategy for the Athabasca Oil Sands Area
Download1999
Alberta's environmental and natural resource management systems are designed to make sure the environmental impact of development is minimised, and the air, land, surface water and drinkable groundwater all meet provincial guidelines. In addition, they are used to ensure disturbed areas are...
-
1976
Birdsall, D.A., Sharp, P.L., Dyke, G.R.,
Between 26 August and 30 October 1974, a reflector device was tested as a deterrent to birds at a small tailings pond (Lower Camp Tailings Pond) located on Syncrude's lease 17, approximately 40 km (25 mi) north of Fort McMurray, Alberta. This tailings pond provided a situation analogous (though...
-
2003
Chapman, J., Hockley, D., Sexsmith, K., Arthur, B., Donohue, S.
At the proposed Crandon Project, mill tailings would be depyritised for upland disposal. The resulting pyrite concentrate would be disposed of in the underground workings as a cement-amended paste backfill. In the long term, the underground workings would be flooded and the potential for the...
-
2003
Hockley, D. E., Noel, M., Rykaart, E. M., Jahn, S., Paul, M.
Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m by 65 m, and was constructed using full-scale equipment and construction practices. Extensive...