Search
Skip to Search Results- 103Smreciu, A.
- 101Gould, K.
- 101Wood, S.
- 23GAPSSHRC
- 14OSRIN
- 10Oil Sands Research and Information Network
- 624Oil Sands Research and Information Network (OSRIN)
- 216Oil Sands Research and Information Network (OSRIN)/AOSERP Reports
- 173Graduate and Postdoctoral Studies (GPS), Faculty of
- 173Graduate and Postdoctoral Studies (GPS), Faculty of /Theses and Dissertations
- 108Oil Sands Research and Information Network (OSRIN)/Government of Alberta Reports
- 100Oil Sands Research and Information Network (OSRIN)/Revegetation Species Profiles
- 664Report
- 173Thesis
- 54Research Material
- 49Article (Published)
- 14Conference/Workshop Presentation
- 8Article (Draft / Submitted)
-
1972
Conservation and Utilization Committee
The basic premise is that the demand for synthetic crude oil is from markets external to Canada, consequently one primary objective and five secondary objectives are suggested: 1. Alberta should regulate and control the Athabasca tar sands development for the socio-economic benefit of Albertans....
-
1970
Alberta Health, Environmental Health Services Division
Five sampling surveys were conducted on the waters of the Athabasca River and its tributaries during the winter of 1969 - 1970. Samples were taken to analyze the river waters for chemical composition and bacteriological constituents on a regular basis. Loadings of Biochemical Oxygen Demanding...
-
1969
Alberta Health, Environmental Health Services Division
The Athabasca River serves as a source of water supply and a receiving stream for the wastes of two major industries and several communities. This report presents the summary of water quality in the Athabasca River during six sampling surveys (including a site at Fort McMurray, Tar Island, above...
-
Preliminary compatibility studies of G.C.O.S. sand tailings pond water with Athabasca River
Download1968
Alberta Health, Environmental Health Services Division
On May 30, 1968 G.C.O.S requested permission to discharge 110 x 106 ft3 of effluent from the sands tailings pond at the Fort McMurray site into the Athabasca River during periods of high river flow. G.C.O.S. outlined the events which made this request necessary in order that an adequate base be...