This decommissioned ERA site remains active temporarily to support our final migration steps to https://ualberta.scholaris.ca, ERA's new home. All new collections and items, including Spring 2025 theses, are at that site. For assistance, please contact erahelp@ualberta.ca.
Search
Skip to Search Results- 1Building information modelling
- 1Cost analysis
- 1EFFICIENT ARCHITECTURAL LAYOUT
- 1EMERGENCY DEPARTMENT PROCESS FLOW IMPROVEMENT
- 1Energy analysis
- 1Energy simulation
-
EMERGENCY DEPARTMENT PROCESS FLOW IMPROVEMENT BASED ON EFFICIENT ARCHITECTURAL LAYOUT, LEAN CONCEPT AND POST-LEAN SIMULATION
DownloadSpring 2012
Long waiting times in Emergency Departments (ED) have been an issue in Canadian hospitals for years. Many factors have contributed to the excessive waiting time, including the current design scheme which is known architecturally as the “Funnel Design Scheme.” Current architectural and...
-
Spring 2017
The fast-paced progress associated with offsite construction projects necessitates special attention toward project design, estimation, and planning. Traditionally, the relationship between project design and cost lacks clarity during the early design stages of a project. While design efforts aim...