Search
Skip to Search Results- 3Hasan, Md Monjurul
- 3Kostic, Branislav Z
- 3Yu, Miao
- 2Afifi, Mona
- 2Altaf, Mohammed Sadiq
- 2Alwisy, Aladdin
- 31Al-Hussein, Mohamed (Civil and Environmental Engineering)
- 25Deutsch, Clayton (Civil and Environmental Engineering)
- 23AbouRizk, Simaan (Civil and Environmental Engineering)
- 20Chalaturnyk, Rick (Civil and Environmental Engineering)
- 20Liu, Yang (Civil and Environmental Engineering)
- 18Bayat, Alireza (Civil and Environmental Engineering)
-
Repair of Fatigue Cracks in Steel Members Using Adhesively Bonded Carbon Fiber Reinforced Polymers (CFRP)
DownloadSpring 2021
Bonding fiber reinforced polymer (FRP) composites is emerging as an alternative to the fatigue crack repair techniques because of its several advantages over the conventional fatigue crack repair methods and materials. Its major advantages include its higher stiffness and strength, choice of...
-
Reservoir and geomechanical coupled simulation of CO2 sequestration and enhanced coalbed methane recovery
DownloadFall 2009
Coalbeds are an extremely complicated porous medium with characteristics of heterogeneity, dual porosity and stress sensitivity. In the past decades great achievements have been made to the simulation models of pressure depletion coalbed methane (CBM) recovery process and CO2 sequestration and...
-
Spring 2022
A noteworthy caprock failure occurred on the Joslyn Steam Assisted Gravity Drainage (SAGD) property in 2006 that continues to have a significant impact on the approval process for future SAGD projects. Two reports were released by Alberta government, which are AER Review and Analysis: Total E&P...
-
Fall 2015
Sustainable reservoir management is essential to ensure the productivity of agriculture and to adapt to a changing climate. This research firstly analyzes reservoir managers’ perspectives in Alberta’s heavily-allocated South Saskatchewan River Basin by applying a qualitative survey methodology in...
-
Fall 2016
The Underground Coal Gasification (UCG) is still not in a worldwide operation despite inheriting an old idea which is nearly one and a half century old. Aside from effects by other fuel sources on development of the UCG and from a technical perspective, this delay is due to the complex nature of...
-
Residential construction manufacturing estimating framework: the case of lightweight timber framing
DownloadFall 2020
The term industrialized construction was adopted by the offsite construction industry where the building components are prefabricated in factories and then transported to the construction site for on-site assembly. With this shift towards industrialized construction, new challenges were...
-
Spring 2016
Improving the accuracy of estimates is of great importance in the mining industry. These estimates can be improved with the use of available secondary data. This includes any less trusted data source containing bias and error such as production sampling, legacy drill holes, or cheaper lower...
-
Resource recovery strategies for municipal water planning and management: a system dynamics modeling approach
DownloadFall 2023
The true value of water has not yet been captured in municipal water planning and management, despite the increasing availability of technologies designed to create value from wastewater. Adapting system processes for water reclamation, energy generation, and production of other outputs (such as...