This is a decommissioned version of ERA which is running to enable completion of migration processes. All new collections and items and all edits to existing items should go to our new ERA instance at https://ualberta.scholaris.ca - Please contact us at erahelp@ualberta.ca for assistance!
Communities and Collections
Usage
- 240 views
- 446 downloads
2024 Pit Lake Monitoring and Research Report
-
Environmental Protection and Enhancement Act Approval No. 26-03, as amended
-
- Author(s) / Creator(s)
-
- Date created
- 2024-07-31
-
- Subjects / Keywords
-
- base mine
- baseline
- reclamation
- FT
- fine tails
- MFT
- mature fine tails
- sludge
- FFT
- fluid fine tails
- Environmental Research
- End Pit Lake
- Water capped tailings
- BML
- WCTT
- water capped tailings technology
- physical limnology
- limnology
- FFT geochemistry
- groundwater
- turbidity
- shoreline hydrocarbon
- Monitoring
- Reclamation and Closure
- Baseline Lake Monitoring and Research
- COSIA
- Physical Limnology
- Aquatic Biology
- Water Quality
- Toxicity
- Meterology
- Climate
- Water balance
- Water Capped Tailings Technology
- Groundwater assessment
- Turbidity
- Lake
- Lake stratification
- oilsands pit lake
-
- Type of Item
- Report
-
- License
- Permission for non-commercial use, publication or presentation of excerpts or figures is granted, provided appropriate attribution is cited. Commercial reproduction, in whole or in part, is not permitted without prior written consent. The use of these materials by the end user is done without any affiliation with or endorsement by Syncrude Canada Ltd. Reliance upon the end user's use of these materials is at the sole risk of the end user.