Performance of Cover System Field Trials for Waste Rock at Myra Falls Operations

  • Author(s) / Creator(s)
  • Four field test plots were constructed in 1998 on a sloped waste rock surface at the Myra Falls Operations of Boliden Westmin (Canada) Limited to evaluate hydraulic performance of alternate cover system designs. The field test plot cover systems were designed to control oxygen ingress and water infiltration to the underlying waste rock while providing a medium for a grass and legume vegetation cover. The test plots consisted of a bare waste rock surface (control plot), and three additional plots consisting of native compacted till placed directly on the waste rock surface, overlain by non-compacted till. Two of the test plots included a compacted till layer ameliorated with flyash and bentonite, respectively, to improve moisture retention and reduce permeability. The third test plot consisted of a compacted layer of native till overlain by non-compacted till. A performance monitoring system was installed in each test plot to evaluate net percolation and oxygen ingress to the underlying waste rock. In addition, each test plot has profiles of matric suction, water content, and temperature sensors installed at up-slope and down slope locations. A review of four years of monitoring data shows that the compacted till/bentonite cover system has been most successful in limiting the infiltration of meteoric waters and oxygen ingress to the underlying waste rock material. The compacted till/flyash and compacted till cover systems have produced similar net percolation results and neither have functioned well in maintaining an oxygen ingress layer throughout the year. The amelioration of bentonite with till to produce a compacted barrier layer shows promise in reducing water and oxygen ingress at the MFO site, while the incorporation of flyash with the till did not result in a significant increase in performance. The field performance data clearly demonstrates the need for developing field trials prior to full-scale construction, as opposed to relying solely on an un-calibrated numerical modelling to design the full-scale cover system.

  • Date created
    2003-01-01
  • Subjects / Keywords
  • Type of Item
    Article (Published)
  • DOI
    https://doi.org/10.7939/r3-e1xg-n226
  • License
    Use of this product is restricted to current faculty, staff, and students of the University. It is the responsibility of each user to ensure that he or she uses this product for individual, non-commercial educational or research purposes only, and does not systematically download or retain substantial portions of information. Users may not reproduce or redistribute unprocessed/raw data portions of the data to any third party, or otherwise engage in the systematic retransmission or commercialization of the data.