ERA

Download the full-sized PDF of Review of flood stage frequency estimates for the City of Fort McMurray: Final reportDownload the full-sized PDF

Analytics

Share

Permanent link (DOI): https://doi.org/10.7939/R3697011D

Download

Export to: EndNote  |  Zotero  |  Mendeley

Communities

This file is in the following communities:

Oil Sands Research and Information Network (OSRIN)

Collections

This file is in the following collections:

Government of Alberta Reports

Review of flood stage frequency estimates for the City of Fort McMurray: Final report Open Access

Descriptions

Author or creator
Alberta Environmental Protection, Technical Services and Monitoring Division
Additional contributors
Subject/Keyword
Alberta
Hydrology
Fort McMurray
Flood
Athabasca River
Ice Jam
Type of item
Report
Language
English
Place
Canada, Alberta, Fort McMurray
Time
Description
This study was undertaken for the Technical Committee, Canada-Alberta Flood Damage Reduction Program in response to concerns raised by the City of Fort McMurray over the validity of the elevation established in previous studies as representing the 1 in 100 year design flood level. The specific objectives were first, to examine the historic data and assess it reliability and second, to update the flood frequency analysis, incorporating additional data collected in recent years. The main conclusions arising from the study are: a) In spite of some limitations, the information available on the 1875 ice jam event and most other historic events is considered to be sufficiently reliable for inclusion in the flood frequency analysis, b) the 1 in 100 year break-up stage at Fort McMurray based on the updated frequency analysis is 250.0 m, and c) The estimated return period for the 1875 event is in the order of 350 years and corresponds to a flood stage 2.0 m above the 1 in 100 year stage. Designation of flood risk areas based on an historical flood that has exceeded the 1 in 100 year event is an option under the Flood Damage Reduction Program. However, given the extreme magnitude of the maximum historic event at Fort McMurray, it is felt to be unreasonable and inappropriate to designate to such a level. Instead, it is recommended that the updated 1 in 100 year breakup stage of 250.0 m be adopted as the design flood level for designation under the Flood Damage Reduction Program.
Date created
1993
DOI
doi:10.7939/R3697011D
License information
Rights
This material is provided under educational reproduction permissions included in Alberta Environment and Sustainable Resource Development's Copyright and Disclosure Statement, see terms at http://www.environment.alberta.ca/copyright.html. This Statement requires the following identification: \"The source of the materials is Alberta Environment and Sustainable Resource Development http://www.environment.gov.ab.ca/. The use of these materials by the end user is done without any affiliation with or endorsement by the Government of Alberta. Reliance upon the end user's use of these materials is at the risk of the end user.
Citation for previous publication

Source
Link to related item

File Details

Date Uploaded
Date Modified
2014-04-29T17:08:34.986+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: pdf (Portable Document Format)
Mime type: application/pdf
File size: 1455457
Last modified: 2015:10:12 15:15:36-06:00
Filename: 1993 - AENV - Flood Stage Frequency.pdf
Original checksum: eaf9cf1ffcf8f936c706356f3ecd701e
Well formed: false
Valid: false
Status message: Invalid page tree node offset=1306139
Status message: Unexpected error in findFonts java.lang.ClassCastException: edu.harvard.hul.ois.jhove.module.pdf.PdfSimpleObject cannot be cast to edu.harvard.hul.ois.jhove.module.pdf.PdfDictionary offset=4004
Page count: 5
Activity of users you follow
User Activity Date