ERA

Download the full-sized PDF of Assessing Design Flows and Sediment Discharge on the Eastern SlopesDownload the full-sized PDF

Analytics

Share

Permanent link (DOI): https://doi.org/10.7939/R3RV0D68T

Download

Export to: EndNote  |  Zotero  |  Mendeley

Communities

This file is in the following communities:

Oil Sands Research and Information Network (OSRIN)

Collections

This file is in the following collections:

RRTAC Reports

Assessing Design Flows and Sediment Discharge on the Eastern Slopes Open Access

Descriptions

Author or creator
Hydrocon Engineering (Continental) Ltd.
Monenco Consultants Ltd.
Additional contributors
Subject/Keyword
Alberta
Coal
Modeling
Water Bodies
Erosion
RRTAC
RRTAC 87-6
Type of item
Report
Language
English
Place
Canada, Alberta
Time
Description
This document provides an evaluation of currently available rainfall runoff sediment production methodologies, identifies key parameters, and outlines field programs to gather data for model calibration. 1. RAINFALL RUNOFF There are two distinct requirements related to rainfall runoff. Firstly, the entire runoff hydrograph must be determined to provide the hydraulic component for sedimentation pond design. Secondly, only the peak flood flow may be required for the design of ditches and culverts. For either case two separate components of the rainfall process must be described, namely the rainfall and runoff components. 2. SEDIMENT PRODUCTION There are two distinct data requirements related to sediment production. Firstly, there may be a need to develop the sediment graph (i.e., plot the time variation in runoff sediment concentration) associated with a design storm event at the pond inlet. This is required to determine the sediment removal efficiency of a given pond configuration during the specified design storm event. Secondly, the total amount of sediment delivered to the reservoir over the expected life of the reservoir may be estimated. This is required to size the sediment storage volume of an impoundment. 3. RECOMMENDED HYDROLOGIC/SEDIMENTOLOGIC MODEL It is recommended that an existing model be used, rather than designing a new one, because: 1. The development of a new watershed model would be time consuming and therefore, costly. 2. The resulting model would be an untried and untested technique. 3. There is no indication that a new watershed model would be better suited to Alberta conditions than some existing models.
Date created
1987
DOI
doi:10.7939/R3RV0D68T
License information
Rights
This material is provided under educational reproduction permissions included in Alberta Environment and Sustainable Resource Development's Copyright and Disclosure Statement, see terms at http://www.environment.alberta.ca/copyright.html. This Statement requires the following identification: \"The source of the materials is Alberta Environment and Sustainable Resource Development http://www.environment.gov.ab.ca/. The use of these materials by the end user is done without any affiliation with or endorsement by the Government of Alberta. Reliance upon the end user's use of these materials is at the risk of the end user.
Citation for previous publication

Source
Link to related item

File Details

Date Uploaded
Date Modified
2014-04-29T20:35:50.392+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: pdf (Portable Document Format)
Mime type: application/pdf
File size: 4644580
Last modified: 2015:10:12 19:48:26-06:00
Filename: RRTAC 87-6 Assessing design flows and sediment discharge.pdf
Original checksum: 428d388b07a69d1c208db57c498eb621
Well formed: true
Valid: false
Status message: Invalid page tree node offset=3549822
Page count: 98
Activity of users you follow
User Activity Date